After-sales Service: | Yes |
---|---|
Warranty: | 3years |
Output Type: | AC Three Phase |
Gas Source: | Gas |
Certification: | CE, TLC, ISO, CCC |
Power: | >200kW |
Customization: |
---|
Suppliers with verified business licenses
I. Dongturbo Main Business Scope
· Design, Development, Manufacture and Complete Sets of Gas Turbine Units
· Gas Turbine Installation and Commissioning, Maintenance, Operation Management, Spare Parts Supply
Gas Turbine Generator Set Introduction
QD50 gas turbine generator set
QD50 gas turbine generator sets, heavy-duty, is designed and packaged with GENP together, using GENP'S GE5-1 core engine, in accordance with GE' standards and relevant China's standards.
QD50 Performance(ISO condition,natural gas)
Power(MW) 5.5
Electric efficiency(%) 30.7
Heat Rate(kJ/kWh) 11740
Pressure ratio 14.8
Output shaft speed(rpm) 16630
Exhaust temperature(ºC) 574
Exhaust Flow(kg/s) 19.6
Emission(Nox /Co at 100% load)ppmv 25/20
Characteristics
· Modular design, Low site assembly and maintenance time
·Automatic control systems, remote monitoring and diagnostics
·Avilable for site repairing/overhaul, Low maintenance costs
·Longer repairing/ maintenance interval, 12000 hours for combustion
inspection(borescope),24,000 hours for HGPI,48000 hours for overhaul
·Low emission (25ppm)
Fuel
Natural Gas, Dual fuel, diesel, LNG, Biomass Gas etc
QD100 gas turbine generator set
QD100 gas turbine generator sets, heavy-duty, is designed and packaged with GENP together, using GENP'S GE10-1 core engine, in accordance with GE' standards and relevant China's standards.
QD100 Performance(ISO condition,natural gas)
Power(MW) 11.41
Electric efficiency(%) 32.0
Heat Rate(kJ/kWh) 11252
Pressure ratio 15.6
Output shaft speed(rpm) 11000
Exhaust temperature(ºC) 482.3
Exhaust Flow(kg/s) 47.5
Characteristics
· Modular design, Low site assembly and maintenance time
·Automatic control systems, remote monitoring and diagnostics
·Avilable for site repairing/overhaul, Low maintenance costs
·Longer repairing/ maintenance interval, 8000 hours for combustion
inspection(borescope),16,000 hours for HGPI,32000 hours for overhaul
Fuel
Natural Gas, Dual fuel, diesel, LNG, Biomass Gas etc
QD160 gas turbine generator set
QD160 gas turbine generator sets, heavy-duty, is designed and packaged with GENP together, using GENP'S LT16 core engine, in accordance with GE' standards and relevant China's standards.
QD160 Performance(ISO condition,natural gas)
Power(MW) 16.1
Electric efficiency(%) 36
Heat Rate(kJ/kWh) 9999
Pressure ratio 19
Speed(rpm) 7800
Exhaust temperature(ºC) 490
Exhaust Flow(kg/s) 54
Emission(Nox /Co at 100% load)ppmv 25/15
Characteristics
· Modular design, Low site assembly and maintenance time
·Automatic control systems, remote monitoring and diagnostics
·Avilable for site repairing/overhaul, Low maintenance costs
·Longer repairing/ maintenance interval, 35000 hours for overhaul
·Low emission
Fuel
Natural Gas, Dual fuel, diesel, LNG, Biomass Gas etc
QD300 gas turbine generator set
QD300 gas turbine generator sets, heavy-duty, is designed and packaged with GENP together, using GENP'S MS5002E core engine, in accordance with GE' standards and relevant China's standards.
QD300 Performance(ISO condition,natural gas)
Power(MW) 32.757
Electric efficiency(%) 35.85
Heat Rate(kJ/kWh) 10041
Pressure ratio 17
Speed(rpm) 5714
Exhaust temperature(ºC) 517.9
Exhaust Flow(kg/s) 54
Emission(Nox /Co at 100% load)ppmv 25/15
Characteristics
· Modular design, Low site assembly and maintenance time
·Automatic control systems, remote monitoring and diagnostics
·Avilable for site repairing/overhaul, Low maintenance costs
·Longer repairing/ maintenance interval, 48000 hours for overhaul
·Low emission
Fuel
Natural Gas, Dual fuel, diesel, LNG, Biomass Gas etc
QD500 gas turbine generator set
QD500 gas turbine generator sets, heavy-duty, is designed and packaged with GENP together, using Siemens' core engine, in accordance with GE' standards and relevant China's standards.
QD500 Performance(ISO condition,natural gas)
Power(MW) 50.5
Electric efficiency(%) 38.3
Heat Rate(kJ/kWh) 9399
Pressure ratio 21.1
Output shaft speed(rpm) 6600
Exhaust temperature(ºC) 553
Exhaust Flow(kg/s) 134.2
Emission(Nox /Co at 100% load)ppmv 15/5
Characteristics
·High eletric efficiency 38.3%
· Modular design, Low site assembly and maintenance time
·Automatic control systems, remote monitoring and diagnostics
·Avilable for site repairing/overhaul, Low maintenance costs
·Longer repairing/ maintenance interval, 10,000 hours for combusition inspection(borescope),30000 hours for HGPI,60000 hours for overhaul
·Low emission
Fuel
Natural Gas, Dual fuel, diesel, LNG, Biomass Gas etc
II. Pictures of Gas Turbine Project
Gas Turbine Unit Supply
Suppliers with verified business licenses