• 50t Eaf & 50t Lf De-Dusting System
  • 50t Eaf & 50t Lf De-Dusting System
  • 50t Eaf & 50t Lf De-Dusting System
  • 50t Eaf & 50t Lf De-Dusting System
  • 50t Eaf & 50t Lf De-Dusting System
  • 50t Eaf & 50t Lf De-Dusting System

50t Eaf & 50t Lf De-Dusting System

Certification: CE, ISO
Place Style: Horizontal
Range of Applications: Industrial
Type: Eaf
Usage: Steel Molding
Fuel: Gas
Customization:
Gold Member Since 2007

Suppliers with verified business licenses

Rating: 5.0/5

Basic Info.

Model NO.
EAF & LF
Installation Nmethod
Horizontal
Operation Ntype
Automatic
Dust Collecting Method
Dry
Medium Material
Furnace
Dedusting Mode
Eaf
Transport Package
Nude, Wooden Case
Specification
To be checked
Trademark
Ville
Origin
China
HS Code
85149010
Production Capacity
10units Per Year

Product Description

1. Technical parameter
  Dedusting mode: EAF is 4th hole + canopy, LF is 4th hole.
1.1 Long bag type dust collector
SN Item Unit Data Remark
1 Type   LLP10000  
2 Quantity set 1  
3 Filter bag °C ≤120  
4 Bag material Water and oil repellent polyester needle felt
5 Filter area   10000  
6 Fume speed at filter m/min ≤1.2  
7 Fume amount m3/h 600000  
8 Filter bag size mm φ130×6000  
9 Filter bag quantity pcs. 4100  
10 Pulse vavle quantity pcs. 240  
11 System resistance Pa <1500  
12 Dust emission concentration mg/ Nm3 <50  
13 Dust cleaning control   PLC Pulse type, off line
14 Dust room nos. 16  
15 Dust removal mode     Mechanical conveyor
 
1.2 De-dusting fan & motor
SN Item Unit Data Remark
1 Fan model   Y4-73No25F (T)  
2 Quantiy set 1  
3 Fan delivery m3/h 600000  
4 Fan aire pressure Pa 4200  
5 Motor power   1250kW 10kV
6 Quantiy set 1  
7 Motor speed rpm 960  
8 Protection class   IP44  
 
2. Supply list & breakdown price
SN Item Unit Qty Remark
A Mechanical part      
1 Main fume pipeline t 150  
2 Water cooled pipeline m 50 For EAF
3 Water cooled pipeline m 30 For LF
4 Pneumatic butterfly valve set 1  
5 Air mixing valve set 1  
6 EAF fan set 1  
7 EAF motor set 1  
8 Noise insulation & reduction part set 1  
9 Fluid transmission couplier set 1  
10 Bag type dust collector t 330  
11 Air tank set 1 5m3
12 Freeze dryer set 1 5m3
13 Compressed air triplet set set 1  
14 Pipeline fittings set 1  
15 Air source treatment part set 1  
16 Star dust unloader valve set 18 DF300
17 Screw dust conveyor set 2 φ30/φ40
B Electrical part      
1 H.V. incoming panel pc. 1  
2 H.V. breaker panel pc. 1  
3 Liquid resistance starter panel pc. 1  
4 HMI panel pc. 1  
5 PLC panel set 1 Siemens S7-300
6 GGD panel pcs. 4  
7 Field junction box pc. 4  
C Others      
1 Package, customs, doucments   1  
2 Installation material   1  
3 China transportation   1  
  Total Price (FOB china port)    
Supplied by the Buyer:
1) Installation, hydraulic medium, lubrication medium and cleaning medium;
2) Roof canopy (meltshop roof steel structure), pipeline supports, chimney;
3) Civil works and design (Seller provides furnace foundation drawings and civil work requirements),
embedded furnace foundation parts;
4) Water supply and gas supply main inlet are laid to Seller's equipment connection point, 10kV
incoming line to Seller's H.V. panel, L.V. are connect to Seller's L.V. distribution panel.


3. Delivery: 6 month after the Seller receiving down payment.

50t Eaf &amp; 50t Lf De-Dusting System

50t Eaf &amp; 50t Lf De-Dusting System

50t Eaf &amp; 50t Lf De-Dusting System

Sales:
50t Eaf &amp; 50t Lf De-Dusting System

Our Best Service For You
1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testing.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time
c. provide 12 months guarantee period normally.

FAQ For You
1. Q: What is your delivery time ?
A:  Depend on the type of transformer.
2. Q: What is your payment term?
A:  30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q: What kind of standard you follow?
A:  IEC, ANSI, GB, etc
4. Q: What kind of supporting documentation you can provide normally
A:  Quotation, outline drawing, manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list, etc
5. Q: What is your normal warranty period?
A:  12 months after transformer operation.
6. Q: Can u do installation and commission in user's site?
A:  Yes, we can send our installation team to user's country for service.
7. Q: Do you have any experience in this kind of transformer?
A:  Yes, we can provide reference list for check.

Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
 Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
 Global Service
--Wherever you are, VILLE global network will support and provide you with value.
 Quick Response
--In response to your needs without delay, VILLE  knows the value of your time.

Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2007

Suppliers with verified business licenses

Rating: 5.0/5
Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, IATF16949, ISO 14064, QC 080000, ANSI/ESD, ISO 29001, ISO 50001
Import & Export Mode
Have Own Export License
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram