Gold Member Since 2007
Audited Supplier
Ningbo Ville Electric Co., Ltd.

Transformer, Distribution Transformer, Control Transformer manufacturer / supplier in China, offering Power Transformer/Oil Immersed Power Transformer, 15 Strand Billet Continuous Casting Machine CCM, Lvb (T) Series Oil Immersed Inverted Current Transformers and so on.

(/ )

Supplier Homepage Product Power Transformer Others Power Transformer Power Transformer/Oil Immersed Power Transformer

Power Transformer/Oil Immersed Power Transformer

FOB Price: US $1,000-79,999,999 / Piece
Min. Order: 1 Piece
Min. Order FOB Price
1 Piece US $1,000-79,999,999/ Piece
Get Latest Price
Payment Terms: L/C, T/T, D/P, Paypal, Money Gram, Western Union

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: SFZ-4200000/220kv
  • Phase: Three
  • Cooling Method: Oil-immersed Type Transformer
  • Application: Power, Electronic, Instrument, Lighting, Rectifier, Audio
  • Core: Core-type Transformer
  • Winding Type: Two-winding Transformer
Product Description

Structure characteristic of 220KV three winding power transformer

1,Iron core

1. The iron core adopts cold-rolled crystal-oriented silicon steel plate 30Z140 with high quality, low-loss, and no time effect, sheared by Geroge line and with no burr. 1.2 Iron core adopts pulling board structure, the upper and down yoke is clamped by board, to form the frame structure. The iron core adopts advanced lamination process, which effectively controls the no-load loss and electro-magnetic noise.
2 Winding
2.1 Winding adopts mature structure, which ensure the reliability of transformer operation.
2.2 The insulation power field intensity between turns shall be controlled no greater than 1.6kV/mm.
3,Body
3.1 Body adopts mature insulation structure, and strictly guarantee the main axial insulation margin.
3.2 Body mostly adopt multi-coil whole assembly, processed in constant voltage and evaporation, which made coil shrink evenly and with less rebounce, and enhance the electric strength and mechanical strength.
3.3 Adopt laminating wood board or thermal shaped insulation cardboard. Pressed tightly with pin, which ensure the winding is constantly pressed tightly. 
4,leading wire
4.1 The layout of all leading wire is reasonable, which guarantees the enough electric distance and mechanical strenth. 
4.2 All leading wire is cirlulized ,which guarantee the reliable wild or prize connection. 
5,Oil tank
5.1 Oil tank adopts structure of flat top, bell jar type, which add the mechanical strength of oil tank and also make the appearance beautiful and graceful, site installation tend to be more convenient.
5.2 Pipeline with gas relay such as the oil tube and bushing hoist support on top of oil tank is with hoist gradient, to facilitate the gas in transformer flow to gas relay.
5.3 Vacuum oiling is adopted, there is no leakage and permanent distortion in the following test. vacuum-pumping :759mmHg load voltage test: bear 2 times the oil pressure of oil conservator oil surface for 24 hours.
5.4 The structure of transformer is convenient for disassembly and change of bushing and porcelain element.
5.5 The oil drip valve is set on the bottom of oil tank, sampling valve is set in the middle.
5.6 collective gas connecting tube is fixed on the bushing hoist support.
5.7 Transformer is of full-sealed structure, the upper and down oil tanks are required to welded fully. 
6,Oil conservation tank 
6.1 Adopt capsule type, finger type oil level indicator oil conservation tank. 
6.2 The structure is convenient for internal cleaning, the capacity can ensure no oil overflow in 40 ambient temperature with full load, and oil shall be seen from oil level indicator before put into operation in -25.
6.3 Oil conservation tank is equipped with oil-sealed moisture absorber. 
7,Safety protection device:
7.1 Gas relay is fixed in transformer, the standard complies with ZBK41004-89Gas relay.
7.2 There is enough and reliable pressure release device, and matched with oil spray pipe, the direction of oil spraying is downward. 
8,Oil temperature measuring device:
8.1 There is pipe support of mercury thermometer, which is  set on the top of oil tank.
8.2 There is temperature controller,  the accuracy of thermometer complies with the related standard. Quantity and technical requirement shall as per tender document. 
9,Each component  of transformer shall be prefabricated once in manufacture factory, marked, to ensure the smooth procedure of site assembly. Before Ex-factory, inner core shall be check, and clean the fifth in transformer.
Power Transformer/Oil Immersed Power Transformer
Send your message to this supplier
Avatar
Ms. jennifer
manager
*From:
To: Ms. jennifer
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now