Customization: | Available |
---|---|
Application: | Power |
Phase: | Three |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
HMK7 controller (hereafter referred as controller) is a controlling device used to combine with SHM-1 motor
drive unit to realize electrical control of switching operation for on-load tap changer.
Controller can indicate the operation status of tap change and tap positions.
Controller provides complete terminals for BCD code output (contact capacity: 0.5A 120V / AC or 1A 28V / DC)
and remote action signal input (non-potential contacts).
Thus it can realize remote monitoring of OLTC. It can also be connected to host via RS485 communication
interface for remote control and monitoring of on-load tap changer.
Working conditions
1. The ambient temperature shall be from -10ºC to + 40ºC ;
2. Relative humidity is less than 85% ;
3. Altitude is not higher than 2500 m;
4. Free of obvious vibration and shock;
5. Free of explosive media, corrosive gases which will cause the damage to the metal or insulation material, or
conductive dust;
6. Indoor application only.
Main technical data
Scope of application
Shm-1 electric mechanism
supply voltage:220V AC or 240V AC
Rated frequency:50Hz or 60Hz
major function:
1. Gear display
2. "1-N", "n-1" and "stop" operation buttons
3. Remote control operation signal input
4. BCD code position signal output
5. RS485 communication interface
WARMLY WELCOME YOU TO GIVE US COMMENT AND SUGGESTION FOR OUR PRODUCTS. THANK YOU
FOR YOUR SUPPORT AND COORDINATION.
WE WOULD LIKE TO PROVIDE OUR CUSTOMER WITH HIGH QUALITY PRODUCT,EXCELLENT SERVICE
AND PREFERENTIAL PRICE.
Workshop & Facilities
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of standard you follow? |
A: | IEC, ANSI, CSA, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation, outline drawing, manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: | What is your normal warranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commission in user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |