off-Circuit Tap Changer Transformer Load Break Switch off Load Tap Changer
Contact Supplier
Product Highlights
- Dual Installation Types: Available in both vertical and horizontal types for flexible integration.
- Wide Voltage Range: Rated voltage supports 10kV to 66kV for various power applications.
- High Current Capacity: Rated current ranges from 63A to 1000A to meet diverse load needs.
- Flexible Winding Connection: Supports series, parallel, star, and delta connections on LV and HV windings.
- Efficiency Optimization: Reduces iron loss and increases load efficiency by regulating transformer capacity.
- Non-Energized Operation: Designed to operate safely under non-energized conditions only.
- Comprehensive Warranty: Provides a standard 12-month guarantee period after transformer operation.
- Global Installation Support: Engineers available to travel to user's site for installation and commissioning.
Product Attributes
- Customization
- Available
- Application
- Power
- Phase
- Three
- Model NO.
- vertical type and horizontal type wsl series
- Core
- Core-type Transformer
- Cooling Method
- Oil-immersed Type Transformer
- Winding Type
- Two-winding Transformer
- Certification
- ISO9001
- Usage
- Single-phase Transformer, Rectifier Transformer, Combined Transformer, Power Transformer, Distribution Transformer
- Frequency Characteristics
- Power Frequency
- Brand
- Ville
- Structure
- Three-Column Disconnector
- Installation
- Indoor High-Voltage
- Grounding Mode
- Not Grounding
- Movement Mode
- Vertical Rotary Type
- Number of Poles
- Three Pole
- Grounding
- Un Grounded
- Series
- Three
- Run
- Vertical Rotation
- Switching Mode
- Double-Throw Type
- Common Model
- Vr
- Installation Type
- Vertical Type and Horizontal Type
- Applied Transformer
- Three-Phase and Single-Phase Oil-Immersed Power Tr
- Applied Transformer Frequency
- 50, 60 Hz
- Equipped
- on Transformer Tank or Transform
- Working Condition
- Under Non-Energized Condition.
- Transport Package
- Wooden Case
- Specification
- ISO
- Trademark
- VILLE
- Origin
- Ningbo
- HS Code
- 8504220000
- Production Capacity
- 50000 Sets
Product Images of off-Circuit Tap Changer Transformer Load Break Switch off Load Tap Changer
Find Similar Products
Product Description
Off-circuit Capacity Regulating Tap Changer
This type of tap changer is designed as step changeable facility used for capacity regulating transformer under non-energized condition. It is suitable for three-phase oil-immersed capacity regulating with voltage rated 10kV and below, rated capacity 315kVA and below. It can be connected in series and parallel system on LV and HV
windings or connected b star or delta method through which to realize transformer capacity changeable. By this way we can reduce iron loss and increase transformer load efficiency and power factor avoiding the phenomenon of "Big horse will drag small carriage", and can be used to regulate voltage terminals.
| Type of tap changer | Install Dimenson (mm) | Holes on tank cover (mm) |
||||||
| H | H1 | H2 | H3 | L | Y | Md | ||
| WSL II 125/10-4×3L | 323 | 25 | 106 | 65 | 52 | 196 | M8 | φ43 |
| WSL II 250/10-4×3L | 323 | 25 | 106 | 65 | 52 | 212 | M10 | φ43 |
| WSL II 400/10-4×3L | 474 | 28 | 141 | 105 | 45 | 258 | M16 | φ43 |
| WSL II 630/10-4×3L | 474 | 28 | 141 | 105 | 45 | 270 | M18 | φ43 |
| WSL II 125/10-6×5L | 323 | 25 | 106 | 65 | 52 | 196 | M8 | φ43 |
| WSL II 250/10-6×5L | 323 | 25 | 106 | 65 | 52 | 212 | M10 | φ43 |
| WSL II 400/10-6×5L | 474 | 28 | 141 | 105 | 65 | 298 | M16 | φ43 |
| WSL II 630/10-6×5L | 474 | 28 | 141 | 105 | 65 | 310 | M18 | φ43 |
| WSL II 125/10-8×7L | 323 | 25 | 106 | 65 | 65 | 240 | M8 | φ43 |
| WSL II 250/10-8×7L | 323 | 25 | 106 | 65 | 65 | 256 | M10 | φ43 |
| WSL II 125/35-4×3L | 598 | 25 | 178 | 130 | 55 | 204 | M8 | φ43 |
| WSL II 250/35-4×3L | 598 | 25 | 178 | 130 | 55 | 220 | M10 | φ43 |
| WSL II 400/35-4×3L | 625 | 28 | 184 | 138 | 45 | 258 | M16 | φ43 |
| WSL II 630/35-4×3L | 625 | 28 | 184 | 138 | 45 | 270 | M18 | φ43 |
| WSL II 125/35-6×5L | 598 | 25 | 178 | 130 | 55 | 244 | M8 | φ43 |
| WSL II 250/35-6×5L | 598 | 25 | 178 | 130 | 55 | 260 | M10 | φ43 |
| WSL II 400/35-6×5L | 625 | 28 | 184 | 138 | 65 | 298 | M16 | φ43 |
| WSL II 630/35-6×5L | 625 | 28 | 184 | 138 | 65 | 310 | M18 | φ43 |
| WSL II 125/66-4×3L | 1082 | 25 | 300 | 250 | 50 | 232 | M8 | φ43 |
| WSL II 250/66-4×3L | 1082 | 25 | 300 | 250 | 50 | 248 | M10 | φ43 |
| WSL II 125/66-6×5L | 1082 | 25 | 300 | 250 | 55 | 332 | M8 | φ43 |
| WSL II 250/66-6×5L | 1082 | 25 | 300 | 250 | 55 | 348 | M10 | φ43 |
| WSL IV 125/35-3×2L(Y-Delta) | 598 | 25 | 178 | 130 | 55 | 308 | M8 | φ43 |
| WSL IV 250/35-3×2L(Y-Delta) | 598 | 25 | 178 | 130 | 55 | 324 | M10 | φ43 |
Tap changer manufacturing with fullest vertical integration
Tap Changer Products Range On-Load Tap Changer:
* Conventional OLTC for transformer with voltage up to 765kV
*Vacuum OLTC for oil transformer with voltage up to 765kV
*Vacuum OLTC for dry transformer with voltage of 72.5kV
Off-Circuit Tap Changer
* Application for the transformer with voltage up to 765kV
Our Performance:
| 1. | Pre sale service |
| a. | make technical solution |
| b. | send quotation, technical data sheet and drawing |
| c. | prepare power transmission plan, testing plan,and shipment plan |
| 2. | In sale service |
| a. | supervise the manufacturing schedule totally in accordance with the plan |
| b. | send photos to customer during every manufacturing process(hold point) |
| c. | inform the customer one week before testinng. |
| 3. | After sale service |
| a. | installation and commissioning, training the workers |
| b. | quick response within 12 hours any time |
| c. | provide 12 months gurantee period normally. |
FAQ For You
| 1. Q: | What is your delivery time ? |
| A: | Depend on the type of transformer. |
| 2. Q: | What is your payment term? |
| A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
| 3. Q: | What kind of starndard you follow? |
| A: | IEC, ANSI, CSA, GB, etc |
| 4. Q: | What kind of supporting documentation you can provide normally |
| A: | Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
| 5. Q: | What is your normal wanrranty period? |
| A: | 12 months after transformer operation. |
| 6. Q: | Can u do installation and commissioningin user's site? |
| A: | Yes, we can send our installation team to user's country for service. |
| 7. Q: | Do you have any experience in this kind of transformer? |
| A: | Yes, we can provide reference list for check. |
| 8. Q: | Are you manufacturer or trading company? |
| A: | Manufacturer and Trading company. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and please trust both of us will create a brilliant future!
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR253923". Items marked "" are certified.
Company Profile
Ningbo Ville Electric ( Enterprise) Co., Ltd. It is a well-know listed company in China specialized in R& D and manufacture of transformer Specialized in research, development, production of transformer and high voltage & Low voltage electrical power equipment.
Our Transmission and distribution companies can provide with whole solution for transformer substation and switch substation trunkey project!
The rated voltage is up to 550kV.
It locates in Hi-technical enterprise R & D center zone of Ningbo, Zhejiang province, which is one of the well-know coastal city in China. Its professional engaged in power substation, power plant project and electrical power complete equipments.
Working field: Manufacturing, engineering, designing, executing and commissioning for HV and LV electrical products. Transformer custom made up to 550KV.
Our transformer factory main working is visiting end user's site do measure and reseach before designe, and providing economic transformer solution for customer. Engineering, manufacturing, executing, commissioning and repairing for different kind of transformer (04kv -500kv ).
The products are mainly used in Steel plant; Power - Fossil fuel plant, Nuclear power plant, Railway, Subway and Airport. Wind power generation; Hydroelectric plant engineering; International power generation plant; Power substation transmission and distribution; Residential housing estate power distribution system and so on.
Transformer factory Product includes:
Three phase double (three)- winding power transformer, generator power transformer, auto power transformer, rectifier transformer for each industry, furnace transformer, movable transformer, traction transformer and reactor, power plant auxiliary and standby transformers, transformers for substations of backbone and distribution networks. Transformer for metallurgical companies etc.
In order to achieve the enterprise's strategic target---being stronger, larger, and superior, we continue to expand throughout the world's markets for power transmission and distribution area. And we also actively attach our team to competition, walking forward to the mission of "First-class worldwide transformer supplier"
Supply the guide drawings and installation manuals information directions on the method of handling, storage, mounting and erection of transformers.
Power equipment application:
Power-fossil fuel plant, Steel plant, Infrastructure- railway, international generation, substation, hydropower station, wind power substation, transmission and distribution.
We has excellent experience and good capacity in complete projects equipments in Generation, Substation, Transmission and Distribution from 400V-50kv, especially in Power plant, Substation construction and Transmission line, including of design, complete equipment, installation, Commissioningand after-sales service, and also design the complete Electrical Solutions according to customer's demand. We are mainly services to International State Power Board, Power Construction Contractor, Power Project Contractor, Factories and the Electric Power Project in the world.
In order to achieve the enterprise's strategic target---being stronger, larger, and superior, we continue to expand throughout the world's markets for power transmission and distribution area. And we also actively attach our team to competition, walking forward to the mission of "First-class worldwide electrical equipment supplier"
About Our Factory & Business Background
- Address
- FL6, No. C12 Building, Guanghua Road Ningbo R&D Park, Ningbo National Hi-tech zone, Ningbo, Zhejiang, China
- Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, FCA, EXW
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 3-6 months - Nearest Port
- ningbo, shanghai, dalian
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2006-07-05
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is your delivery time?
- Depend on the type of transformer.
- What is your payment term?
- 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
- What kind of starndard you follow?
- IEC, ANSI, CSA, GB, etc
- What kind of supporting documentation you can provide normally
- Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc
- What is your normal wanrranty period?
- 12 months after transformer operation.
- Can u do installation and commissioningin user's site?
- Yes, we can send our installation team to user's country for service.
- Do you have any experience in this kind of transformer?
- Yes, we can provide reference list for check.
- Are you manufacturer or trading company?
- Manufacturer and Trading company.
Send your message to this supplier
People who viewed this also viewed
-
US$500.00-80,000.00 / Piece
-
US$200.00-40,000.00 / Piece
-
US$280,000.00-390,000.00 / Piece
-
Sg-10 10kVA Three-Phase Transformer 380V to 380V 220V 200V 110V Control Isolation Transformer 5000vaUS$175.00-330.00 / Piece
-
US$200.00-40,000.00 / Piece
-
US$1,000.00-20,000.00 / Piece
-
US$2,000.00-5,000.00 / Piece
-
US$200.00-2,000.00 / Piece
-
US$50,000.00-150,000.00 / Piece
-
US$2,900,000.00-3,000,000.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Transformer Components
- Transformer Tap Changer
- off-Circuit Tap Changer Transformer Load Break Switch off Load Tap Changer
Related Categories
Hot Searches
- China Circuit
- Integrated Circuit Factories
- Electric Circuit Factories
- Circuit Board Factories
- Tap Switch
- Tap Changer Transformer
- Circuit Tap
- Tap Transformer
- Tap Changer For Transformer
- Top 10 Circuit
- Tap Changer Bulkbuy