1. Main technical parameters
SN |
Description |
Unit |
Data |
1 |
Diameter of shell |
mm |
Φ3200 |
2 |
Diameter of electrodes pitch circle |
mm |
Φ850 |
3 |
Electrode diameter |
mm |
Φ200 |
4 |
Electrode traveling stroke |
mm |
1400 |
5 |
Electrode traveling speed |
m/min |
Up:4 down:3 |
6 |
Max. steel tapping angle |
|
42° |
7 |
Max. slag tapping angle |
|
12° |
8 |
Rated transformer capacity |
kVA |
2500 |
9 |
Primary voltage of transformer |
kV |
10 |
10 |
Frequency |
Hz |
50 |
11 |
Hydraulic system working pressure |
MPa |
8 |
12 |
Hydraulic medium |
|
Hydraulic oil |
13 |
Cooling water circulation flow |
m3/h |
80 |
2. Scope of Supply
SN |
Item |
Qty |
Remark |
1 |
Mechanical parts |
|
|
1.1 |
Furnace body |
1 |
|
1.2 |
Tilting mechanism & locking device |
1 |
|
1.3 |
Furnace roof |
1 |
|
1.4 |
Electrode traveling mechanism |
1 |
VVVF driving |
1.5 |
Cooling water distributor |
1 |
|
1.6 |
Hydraulic power pack |
1 |
Working pressure: 8MPa |
2 |
Electrical parts |
1 |
|
2.1 |
Furnace transformer |
1 |
2500kVA/10kV |
2.2 |
High voltage switchboard |
1 |
GGA panel, 10kV |
2.3 |
Short network & water cooled cable |
1 |
|
2.4 |
Lower voltage control panel |
1 |
|
2.5 |
PLC automation and HMI system |
1 |
Siemens PLC S7-300 |
3 Cooling water requirement:
Water pressure 0.3MPa
Inlet water temperature ≤35ºC
Outlet water temperature ≤55ºC
Water quality(GB/T10067.1-1988) Industry clean water
Supplied by the Buyer:
1) Installation and installation material, Furnace refractory lining, Hydraulic medium, lubrication medium and cleaning
medium, Graphite electrodes;
2) Civil works and design (Seller provides furnace foundation drawings and civil work requirements), embedded furnace
foundation parts;
3) Water supply and gas supply main inlet are laid to Seller's equipment connection point, H.V. incoming line is connected
to seller's H.V. switchboard and Transformer terminals, L.V. incoming lines are connect to Seller's L.V. power distribution panel.
3. Delivery: 3 months after date the Seller receiving down payment
Our Best Service For You
1. |
Pre sale service |
a. |
make technical solution |
b. |
send quotation, technical data sheet and drawing |
c. |
prepare power transmission plan, testing plan and shipment plan |
2. |
In sale service |
a. |
supervise the manufacturing schedule totally in accordance with the plan |
b. |
send photos to customer during every manufacturing process(hold point) |
c. |
inform the customer one week before testing. |
3. |
After sale service |
a. |
installation and commissioning, training the workers |
b. |
quick response within 12 hours any time |
c. |
provide 12 months guarantee period normally. |
FAQ For You
1. Q: |
What is your delivery time ? |
A: |
Depend on the type of transformer. |
2. Q: |
What is your payment term? |
A: |
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: |
What kind of standard you follow? |
A: |
IEC, ANSI, GB, etc |
4. Q: |
What kind of supporting documentation you can provide normally |
A: |
Quotation, outline drawing, manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: |
What is your normal warranty period? |
A: |
12 months after transformer operation. |
6. Q: |
Can u do installation and commission in user's site? |
A: |
Yes, we can send our installation team to user's country for service. |
7. Q: |
Do you have any experience in this kind of transformer? |
A: |
Yes, we can provide reference list for check. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and please trust both of
us will create a brilliant future!