Product introduction:
Low voltage pure-porcelain bushing with flange structure plays an important role in reducing the level of partial
discharge,improving the flexural strength and reducing leakage.
In addition ,the cast aluminum flange,instead of the previous traditional pressure claw structure,not only
improves the overall appearance of the product,but also facilitate the on-site installation.
Presently,the annual production capacity of 24kv and above voltage bushing is 30,000 and nearly 5000
supporting equipment for 110kv and above voltage current transformer is provided annually. We are capable of
high and efficient productivity in casting,processing,assembling and testing. The earliest product has been
running for more than 10years.
With continuous innovation and improvement,our products will become Perfet and we will keep rolling out new
products eliminating hidden dangers in sealing bushings and achieving flexural strength and excellent
appearance.
Bushing Factory Profile :
Technical leadership through continuous innovation
Excellent products through fine workmanship
Stable and reliable quality through persistent improvement
Assurance of consumer satisfaction through high-quality service
Main Products
Current transformer used in GIS and GCB
Epoxy casting current transformer
Current transformer used in transformer
46kv and below voltage transformer bushing with low pd
Oil impregnaged paper condenser bushing of 40.5 above voltage
Epoxy impregnated condenser bushing of 40.5 above voltage
GIS bushing
Dry equi-potentil porcelain post insulator and porcelain house
Copper and aluminum casting and fabrication
Disconnector for neutral spot of transformer,arc horn,and zero sequence CT
Set of high-voltage test equipment,filter in partial discharge testing
Production Facility and workshop
Our Best Service For You
1. |
Pre sale service |
a. |
make technical solution |
b. |
send quotation, technical data sheet and drawing |
c. |
prepare power transmission plan, testing plan and shipment plan |
2. |
In sale service |
a. |
supervise the manufacturing schedule totally in accordance with the plan |
b. |
send photos to customer during every manufacturing process(hold point) |
c. |
inform the customer one week before testing. |
3. |
After sale service |
a. |
installation and commissioning, training the workers |
b. |
quick response within 12 hours any time |
c. |
provide 12 months guarantee period normally. |