| Customization: | Available |
|---|---|
| Application: | Power, Electronic, Instrument, Lighting, Rectifier, Audio, Furnace Transformer |
| Phase: | Three |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency



Introduction:
The ferroalloy furnace transformer is ferroalloy furnace (as a submerged arc furnace; submerged arc furnace also called arc resistance furnace, once called -arc furnace) with the power of the transformer. The ferroalloy furnace transformer belongs to bury arc furnace transformer (named arc furnace transformer before).
Smelting of Carbon Steel/Low-Alloy Steel:It is adapted to the short-process production lines of large iron and steel plants, providing molten steel raw materials for basic steel products such as construction steel (deformed steel bars, wire rods) and mechanical manufacturing steel (plates, sections). Compared with the traditional "blast furnace-converter" long process, short-process steelmaking relies more on arc furnaces. Moreover, the 140MVA-level equipment can achieve high-capacity continuous production (the smelting cycle of a single furnace is about 40-60 minutes, with a daily output of up to 2,000-3,000 tons), making it suitable for iron and steel enterprises in regions rich in scrap steel resources.
HTSFPZ-25000/66kv
Capacity: 1000~25000kva
voltage:10kv ;35kv;2x35kv ;110kv

Company reference job:

| 1. | Pre sale service |
| a. | make technical solution |
| b. | send quotation, technical data sheet and drawing |
| c. | prepare power transmission plan, testing plan,and shipment plan |
| 2. | In sale service |
| a. | supervise the manufacturing schedule totally in accordance with the plan |
| b. | send photos to customer during every manufacturing process(hold point) |
| c. | inform the customer one week before testinng. |
| 3. | After sale service |
| a. | installation and commissioning, training the workers |
| b. | quick response within 12 hours any time |
| c. | provide 12 months gurantee period normally. |