Customization: | Available |
---|---|
Application: | Power |
Phase: | Three |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introduction of features
Manual operation and automatic operation
Remote control operation and local operation
Step-by-step operation as well as overrunning continuously
Local position indicating, remote position indicating
Local operation push button
Record of operating times
Reliable overload protection
Standard aviation socket terminal, easy to connection.
BCD code position signal output contact
Over-current lockout protection input terminal
One to one position signal output contact (terminal block)
Working condition
1 Altitude must not exceed 2500 meters
2 Ambient temperature: -25ºC~ 40ºC
3 Vertical mounting gradient can't exceed 5%
4 Free of serious dust or explosive, corrosive gas.
Design
SHM-III type motor drive unit adopts modular and standardization design principles. computer program encoder
and photoelectric conversion technology to substitute the previous mechanical elements with contacts. The
connection/disconnection of electrical signal can be realized without contact and mechanical control. SHM motor
drive realizes the separation of mechanical and electrical. The mechancal part and electrical part are installed
in separate housing thus the electrical element influence caused by environment will be reduced to a minmun.
Appearance of control cabinet
1 The housing consists of two parts, the housing and the cover ,which both are cast at low pressure.by
corrosion-resistant aluminum alloy. Protective paints coated on the surface, The whole housing and the cover
are fully-sealed , its protection grade of IP66.
2 There are 2 aviation sockets as inlet passage on the bottom of the housing.
Internal structure
1 Drive section
Drive unit is a low noise and pulley drive system, For one tap change, SHM-I output shaft will turn 16.5
revolutions, SHM-II output shaft will turn one or two revolutions.
Note: Pulley system must not contact lubrication oil.
2 Position indicating section
The indication dial shows clearly the position of motor drive unit and on-load tap changer.
The electromagnetic counter records the actual operations of motor drive unit. This section is not necessary to
make maintenance as the mechanical drive of whole position indicating and photoelectric conversion section
are installed in a sealed cabinet.
COMPANY PROFILE:
Main product line: Tap changer and HV switchgear
Tap changer manufacturing with fullest vertical integration
Tap Changer Products Range On-Load Tap Changer:
* Conventional OLTC for transformer with voltage up to 765kV
*Vacuum OLTC for oil transformer with voltage up to 765kV
*Vacuum OLTC for dry transformer with voltage of 72.5kV
Off-Circuit Tap Changer
* Application for the transformer with voltage up to 765kV
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of standard you follow? |
A: | IEC, ANSI, CSA, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation, outline drawing, manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: | What is your normal warranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commission in user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |