Zhejiang, China
Management System Certification:
ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, IATF16949, ISO 14064, QC 080000, ...
Import & Export Mode:
Have Own Export License
Terms of Payment:
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms):
FOB, CFR, CIF, FCA, EXW
OEM/ODM Availability:
Yes
OEM/ODM Service
Sample Available
MEI Awards

Cable, Water Cooled Cable, Water Cooled Cable for Furnace manufacturer / supplier in China, offering Water Cooled Cable for Furnace, 8t Spout Electric Arc Furnace, 1t Electric Arc Furnace and so on.

Gold Member Since 2007
Audited Supplier

Water Cooled Cable for Furnace

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $500-5,000/ Piece
Port: Shanghai, China
Production Capacity: 10000PCS Per Year
Payment Terms: L/C, T/T, D/P
Application: Industrial
Voltage: High Voltage Cable
Current: DC & AC
Insulation Material: Rubber
Certification: ISO, CCC
Transport Package: Wooden Case

You Might Also Like

Loading...

Basic Info

Origin: China
HS Code: 85149010
Technical parameter
Cross section                                                    3,800mm2
Min. bending radius                                         750mm
Total cable length                                             13,620mm
Test water pressure                                           10 bar
Working water pressure                                   6 bar
Copper material                                                T2 (Cu+Ag: 99.9%)
Cable jacket                                                     Fiber reinforced vulcanized rubber

Reference:
Water Cooled Cable for Furnace
Water Cooled Cable for Furnace
Water Cooled Cable for Furnace

Sales team:
Water Cooled Cable for Furnace



Our Services

1.

Pre sale service

a.

make technical solution

b.

send quotation, technical data sheet and drawing

c.

prepare power transmission plan, testing plan,and shipment plan

2.

In sale service

a.

supervise the manufacturing schedule totally in accordance with the plan

b.

send photos to customer during every manufacturing process(hold point)

c.

inform the customer one week before testinng.

3.

After sale service

a.

installation and commissioning, training the workers

b.

quick response within 12 hours any time

c.

provide 12 months gurantee period normally.

 


FAQ

1. Q:

What is your delivery time ?

A: 

Depend on the type of transformer.

2. Q:

What is your payment term?

A: 

30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.

3. Q:

What kind of starndard you follow?

A: 

IEC, ANSI, CSA, GB, etc

4. Q:

What kind of supporting documentation you can provide normally

A: 

Quotation,outline drawing,manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list,etc

5. Q:

What is your normal wanrranty period?

A: 

12 months after transformer operation.

6. Q:

Can u do installation and commissioningin user's site?

A: 

Yes, we can send our installation team to user's country for service.

7. Q:

Do you have any experience in this kind of transformer?

A: 

Yes, we can provide reference list for check.

8. Q:

Are you manufacturer or trading company?

A: 

Manufacturer with own import & export company.

 

Our advantages:

Quality Assurance

--From the very beginning, VILLE ensures quality in every step to achieve the best quality.

 Experience Sharing

--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.

 Global Service

--Wherever you are, VILLE global network will support and provide you with value.

 Quick Response

--In response to your needs without delay, VILLE  knows the value of your time.

 

Thanks for choosing VILLE as your reliable partner and please trust both of us will create a brilliant future!

Send your message to this supplier

*From:
*To:
avatar Mr. Green Hsu
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Loading...

Contact Supplier

Mr. Green Hsu
Project Manager