Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer

Product Details
Customization: Available
Application: Power, Electronic, Industrial Company
Phase: Three
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, IATF16949, ISO 14064, QC 080000, ANSI/ESD, ISO 29001, ISO 50001
Import & Export Mode
Have Own Export License
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
  • Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer
  • Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer
  • Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer
  • Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer
  • Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer
  • Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer
Find Similar Products

Basic Info.

Model NO.
SFZ10-31500/110
Core
Core-type Transformer
Cooling Method
Oil-immersed Type Transformer
Winding Type
Two-winding Transformer
Certification
ISO9001-2000, ISO9001, CCC
Usage
Combined Transformer, Power Transformer, Three Phase
Frequency Characteristics
High Frequency
Shape of Core
Ring
Brand
Ville
Test Certification
CQC Transformer Test
Voltage Range Hv
110+-8X1.25%
LV
6.3/6.6/10.5/11/
Rated Power Definitionwer
31500kVA
Tap Changer
Mr or Hm China
Vector Group
Yn, D11
Transport Package
Wooden Cases and Main Body Nude Packing
Specification
IEC Standard
Trademark
vilLE
Origin
China
HS Code
8504231200
Production Capacity
1set/6monthes

Product Description

31500kVA 110KV S10 Dual-winding Power Transformer with on load tap changer

Technical parameters:
Voltage combination and tapping range  HV:110kv +-8x1.25%
                                                                LV: 6.3 6.6 10.5 11
Connection group:yn,d11
Winding combination:H-L
No-load current(%):0.45
No-load loss(kW):26.4
On-load loss(kW ):117
Lmpedance(%):10.5
Weight of active part(kg) Around:40ton
Transport weight(kg):Around 46ton(filling with nitrogen)
Transport dimension (L W H mm):6320x4035x5160
Capacity:31500kva


Structure characteristic:
1,Iron core
1. 1The iron core adopts cold-rolled crystal-oriented silicon steel plate 30Z140 with high quality, low-loss, and no
time effect, sheared by Geroge line and with no burr. 1.2 Iron core adopts pulling board structure, the upper
and down yoke is clamped by board, to form the frame structure. The iron core adopts advanced lamination
process, which effectively controls the no-load loss and electro-magnetic noise.


2 Winding
2.1 Winding adopts mature structure, which ensure the reliability of transformer operation.
2.2 The insulation power field intensity between turns shall be controlled no greater than 1.6kV/mm.

3,Body
3.1 Body adopts mature insulation structure, and strictly guarantee the main axial insulation margin.
3.2 Body mostly adopt multi-coil whole assembly, processed in constant voltage and evaporation, which made
coil shrink evenly and with less rebounce, and enhance the electric strength and mechanical strength.

3.3 Adopt laminating wood board or thermal shaped insulation cardboard. Pressed tightly with pin, which ensure
the winding is constantly pressed tightly. 


4,leading wire
4.1 The layout of all leading wire is reasonable, which guarantees the enough electric distance and mechanical
strenth. 

4.2 All leading wire is cirlulized ,which guarantee the reliable wild or prize connection. 

5,Oil tank
5.1 Oil tank adopts structure of flat top, bell jar type, which add the mechanical strength of oil tank and also
make the appearance beautiful and graceful, site installation tend to be more convenient.

5.2 Pipeline with gas relay such as the oil tube and bushing hoist support on top of oil tank is with hoist
gradient, to facilitate the gas in transformer flow to gas relay.

5.3 Vacuum oiling is adopted, there is no leakage and permanent distortion in the following test. vacuum-
pumping :759mmHg load voltage test: bear 2 times the oil pressure of oil conservator oil surface for 24 hours.

5.4 The structure of transformer is convenient for disassembly and change of bushing and porcelain element.
5.5 The oil drip valve is set on the bottom of oil tank, sampling valve is set in the middle.
5.6 collective gas connecting tube is fixed on the bushing hoist support.
5.7 Transformer is of full-sealed structure, the upper and down oil tanks are required to welded fully. 

6,Oil conservation tank 
6.1 Adopt capsule type, finger type oil level indicator oil conservation tank. 
6.2 The structure is convenient for internal cleaning, the capacity can ensure no oil overflow in 40 ambient
temperature with full load, and oil shall be seen from oil level indicator before put into operation in -25.

6.3 Oil conservation tank is equipped with oil-sealed moisture absorber. 

7,Safety protection device:
7.1 Gas relay is fixed in transformer, the standard complies with ZBK41004-89Gas relay.
7.2 There is enough and reliable pressure release device, and matched with oil spray pipe, the direction of oil
spraying is downward. 


8,Oil temperature measuring device:
8.1 There is pipe support of mercury thermometer, which is  set on the top of oil tank.
8.2 There is temperature controller,  the accuracy of thermometer complies with the related standard. Quantity
and technical requirement shall as per tender document. 


9,Each component  of transformer shall be prefabricated once in manufacture factory, marked, to ensure the
smooth procedure of site assembly. Before Ex-factory, inner core shall be check, and clean the fifth in
transformer.

 
Structure:

Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer


Reference project:
Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer
Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer

Packing and Shipping
Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer
Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer


 
Packaging Details: The accessories packed in plywood cases,the main body in nude.

Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE  knows the value of your time.


Our Best Service For You
1. Pre sale service
A. Make technical solution
B. Send quotation, technical data sheet and drawing
C. Prepare power transmission plan, testing plan,and shipment plan
2. In sale service
A. Supervise the manufacturing schedule totally in accordance with the plan
B. Send photos to customer during every manufacturing process(hold point)
C. Inform the customer one week before testinng.
3. After sale service
A. Installation and commissioning, training the workers
B. Quick response within 12 hours any time
C. Provide 12 months gurantee period normally.

FAQ For You
1.Q: What is your delivery time ?
A: Depend on the type of transformer.
2.Q: What is your payment term?
A: 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3.Q: What kind of starndard you follow?
A: IEC, ANSI, CSA, GB, etc
4.Q: What kind of supporting documentation you can provide normally
A: Quotation,outline drawing,manufacturing plan, quality control plan
Testing plan, financial report, type test report(KEMA, CESI),reference list,etc
5.Q: What is your normal wanrranty period?
A: 12 months after transformer operation.
6.Q: Can u do installation and commissioningin user's site?
A: Yes, we can send our installation team to user's country for service.
7.Q: Do you have any experience in this kind of transformer?
A: Yes, we can provide reference list for check.
8.Q: Are you manufacturer or trading company?
A: Manufacturer and Trading company.

Show

Sfz10-31500/110 31.5mva 110kv Dual-Winding Load Tapping Power Transformer



Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier