Customization: | Available |
---|---|
Certification: | SGS |
Place Style: | Vertical |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Industry Steel Ladle for Foundry Furnace Casting Ladle Steel Making Equipment
Melting Furnace For Sale Metallurgical Steel Ladle
Casting steel ladle manufacturer is important device in steel making. It used for pouring operations, after receiving the liquid metal in the blast furnace, transported by road to the mold at the pouring.
Advantage:
1.Resistance to burning hot metal ladle.
2.Multi-purpose hot metal ladle.
3.Safe and reliable design.
4.Easy operation.
Components:
rotary arm
rotary bearing
transmission device.
Technical Data:
1. Load Capacity: 50-200 ton.
2. Angle of rotation: 360 degree
3. Rotating speed: 1 rotation/min.
4. Swing motor capacity: 7.5-15kw
we produce according to customer's requirements and technical
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of standard you follow? |
A: | IEC, ANSI, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation, outline drawing, manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: | What is your normal warranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commission in user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
we produce according to customer's requirements and technical