Customization: | Available |
---|---|
Application: | Power |
Phase: | Three |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The trackside power transformers are used for stepping down the voltage levels for the railway network. They are used to provide single phase supplies for train overhead systems. The duty of traction supplies transformers is a particularly difficult one, as overloading up to twice full-load current can appear. Furthermore, trackside transformers need to withstand system short-circuits which may be as high as 250 per year of varying magnitude up to full fault current. Height of the unit is reduced by mounting the active part horizontally. We have a wide range of uniquely designed products with advanced design technology to perform seismic and short-circuit conditions. These products are developed over the past experiences and high end technology for the manufacturing and quality tools. Thus these are cost-efficient with long operating life, providing a platform for customer's delight.
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan,and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testinng. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months gurantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of starndard you follow? |
A: | IEC, ANSI, CSA, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation,outline drawing,manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
5. Q: | What is your normal wanrranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commissioningin user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
8. Q: | Are you manufacturer or trading company? |
A: | Manufacturer and Trading company. |