Customization: | Available |
---|---|
Certification: | ISO, CE |
Place Style: | Vertical |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No | Name | Name | Qty | Remark |
1 | Water supply pump for EAF&LF | Q=850m3/h H=60m N=200kW/380V | 2 sets | |
2 | Water supply pump for dedust | Q=900m3/h H=70m N=250kW/380V | 2 sets | |
3 | Water supply pump for CCM mold | Q=380m3/h H=130m N=200kW/380V | 3 sets | |
4 | Water supply pump for CCM | Q=250m3/h H=80m N=75kW/380V | 2 sets | Equipment |
5 | Water supply pump for CCM | Q=250m3/h H=140m N=132kW/380V | 2 sets | Secondary cooling |
6 | Water supply pump for air separation | Q=540m3/h H=60m N=132kW/380V | 2 sets | |
7 | Sewage pump | D=1800mm Q=270m3 H=21.5m N=37kW | 2 sets | |
8 | Second pond lift pump | Q=280m3/h H=44m N=55kW | 2 sets | |
9 | Lift pump to cooling tower | Q=500m3/h H=21m N=55kW | 4 sets | |
10 | Cooling tower | Q=1000m3/h N=30KW In<50ºC Out<35ºC | 3 sets | |
11 | Cooling tower | Q=500m3/h N=30KW In<50ºC Out<35ºC | 2 sets | |
12 | Cooling tower(sewage) | Q=250m3/h N=30KW In<50ºC Out<35ºC | 2 sets | |
13 | Drainage pump | Q=25m3/h H=14m N=2.2kW 380V | 3 sets | |
14 | Chemical adding device | Φ1500mm H=1.5m 1.5kW N=0.55kW,Q=300L/H,H=30m | 2 sets | |
15 | Filter | DN3000 Q=300m3/h | 3 sets | |
16 | Multi-function pump control valve | DN200 250 400 450,PN=1.0MPa | 1 set | |
17 | Stop valve | DN250 300 350 400 450 600 | 1 set | |
18 | Power distribution panel | 12 sets | ||
19 | PLC station | Siemens PLC S7-300 | 2 sets | |
20 | HMI computer | Advantech | 2 sets | |
21 | Instrument | 1 set |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of standard you follow? |
A: | IEC, ANSI, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation, outline drawing, manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: | What is your normal warranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commission in user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |