Customization: | Available |
---|---|
Customized: | Customized |
Condition: | New |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No | Name | Name | Qty | Remark |
1 | Air Filter | 60000m3/h | 1 set | 1 |
2 | Air Compressor Unit | 17000Nm3/h | 2 set | 2 |
3 | Air Pre-cooling System | 1 set | 1 | |
4 | Molecular Sieve Purifying System | 1 set | 1 | |
5 | Distillation tower | 1 set | 1 | |
6 | Booster Turbo Expander | 2 set | 2 | |
7 | Low Pressure Snubber | 1 set | 1 | |
8 | Oxygen Compressor | 3 set | 3 | |
9 | Gaseous oxygen storage tank | 200m3, 3.0Mpa | 3 set | 3 |
10 | Liquid Oxygen tank | 1 set | 1 | |
11 | Liquid Oxygen Pump | 1 set | 1 | |
12 | Nitrogen Compressor | 2 set | 2 | |
13 | Gaseous Nitrogen tank | 200m3, 3.0Mpa | 1 set | 1 |
14 | Liquid Nitrogen Pump | 1 set | 1 | |
15 | Filling equipment | 1 set | 1 | |
16 | Charge Oxygen Compressor | 1 set | 1 | |
17 | Liquid Ar. Storage Tank | 1 set | 1 | |
18 | Vaporizer | 1 set | 1 | |
19 | Filling equipment | 1 set | 1 | |
20 | Gaseous Argon storage tank | 20m3, 3.0Mpa | 1 set | 1 |
21 | PLC Control System | 1 set | 1 | |
22 | H.V panel | 7 set | 7 | |
23 | Instrumental Control System | 1 set | 1 |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of standard you follow? |
A: | IEC, ANSI, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation, outline drawing, manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: | What is your normal warranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commission in user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |