200MVA 220KV Double-winding on load tap changer Power Transformer
1. Key Electrical Parameters | |||
Parameter | High Voltage (HV) | Low Voltage (LV) | Remarks |
Rated Power | 200 MVA | 200 MVA | Continuous operation |
Rated Voltage | 220 kV | 15.75 kV | Vector group: YNd1 |
Highest System Voltage | 245 kV | 24 kV | IEC 60076-3 |
Frequency | 50 Hz | - | - |
Short-Circuit Duration | 3 s | - | Max. fault withstand |
Insulation Level (BIL) | HV: LI 750/AC 241 kV | LV: LI 170/AC 70 kV | Graded insulation (HV) |
Temperature Rise | 55 K (windings) | - | IEC 60076-2 |
No-load Loss, Po) | 50 - 80 kW | to be confirm (BAO STEEL B30P105) | determin silicon steel sheet model no and price (BAO STEEL B30P105) |
Load Loss, Pk) | 300 - 450 kW (75°C) | to be confirm (100% COPPER) | determin copper or AL winding |
Impedance voltage(Uk%) | 10 - 14% % | to be confirm |
Packaging Details: | The accessories packed in plywood cases,the main body in nude. |
1. | Pre sale service |
A. | Make technical solution |
B. | Send quotation, technical data sheet and drawing |
C. | Prepare power transmission plan, testing plan,and shipment plan |
2. | In sale service |
A. | Supervise the manufacturing schedule totally in accordance with the plan |
B. | Send photos to customer during every manufacturing process(hold point) |
C. | Inform the customer one week before testinng. |
3. | After sale service |
A. | Installation and commissioning, training the workers |
B. | Quick response within 12 hours any time |
C. | Provide 12 months gurantee period normally. |