500kv 400kv 330kv 230kv 110kv 69kv 35kv 20kv 10kv 6.6kv 0.4kv Power Transformers Customization Oil Distribution Transformer 1000000kVA
Contact Supplier
Product Highlights
- Winding Customization: Winding type is fully customized to meet specific project requirements.
- Wide Voltage Range: Supports voltage levels from 0.4kV up to 500kV for diverse applications.
- High Capacity: Available up to 1,000,000kVA (1000MVA) for large-scale power transmission.
- Amorphous Alloy Core: Utilizes cold-rolled silicon steel to reduce eddy current loss and noise.
- Comprehensive Certifications: Certified with ISO9001, CCC, and KEMA transformer test standards.
- 12 Months Warranty: Provides a standard 12-month guarantee period after transformer operation.
- Fast Response Support: Technical team offers quick response within 12 hours for any issues.
- Installation Service: Professional team available to handle installation and commissioning onsite.
Product Attributes
- Customization
- Available
- Application
- Power, Electronic, Instrument, Lighting, Rectifier, Audio
- Phase
- Three
- Model NO.
- OSFSZ9-320000 500KV
- Core
- Amorphous Alloy Transformer
- Cooling Method
- Oil-immersed Type Transformer
- Winding Type
- Customized
- Certification
- ISO9001-2000, ISO9001, ISO9001-2000, ISO9001, CCC
- Usage
- Single-phase Transformer, Rectifier Transformer, Combined Transformer, Power Transformer, Distribution Transformer
- Frequency Characteristics
- 50Hz 60Hz
- Shape of Core
- Ring
- Brand
- Ville
- Test Certification
- Kema Transformer Test
- Voltage Range
- 35kv 500kv
- Rated Power
- 1000mva
- Power Definition
- Power Constant on All Tapping of The on-Load Tap
- Transport Package
- Wooden Cases
- Specification
- IEC Standard
- Trademark
- vilLE
- Origin
- China
- HS Code
- 8504231200
- Production Capacity
- 1set/6monthes
- Package Size
- 1.00cm * 1.00cm * 1.00cm
- Package Gross Weight
- 1.000kg
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of 500kv 400kv 330kv 230kv 110kv 69kv 35kv 20kv 10kv 6.6kv 0.4kv Power Transformers Customization Oil Distribution Transformer 1000000kVA
Find Similar Products
Product Description
Oil-immersed power transformers up to 500kV and 1,000 MVA
Core Technology: Full oblique seam lamination• Oil Tank Feature:Composite shielding
Efficiency Improvement:Reduced eddy current loss
• Key Benefits:Minimal loss & overheating resolution


Structure characteristic:
1,Iron core1. 1The iron core adopts cold-rolled crystal-oriented silicon steel plate 30Z140 with high quality, low-loss, and no time effect, sheared by Geroge line and with no burr.
1.2 Iron core adopts pulling board structure, the upper and down yoke is clamped by board, to form the frame structure. The iron core adopts advanced lamination process, which effectively controls the no-load loss and electro-magnetic noise.
2 Winding
2.1 Winding adopts mature structure, which ensure the reliability of transformer operation.
2.2 The insulation power field intensity between turns shall be controlled no greater than 1.6kV/mm.
3,Body
3.1 Body adopts mature insulation structure, and strictly guarantee the main axial insulation margin.
3.2 Body mostly adopt multi-coil whole assembly, processed in constant voltage and evaporation, which made coil shrink evenly and with less rebounce, and enhance the electric strength and mechanical strength.
3.3 Adopt laminating wood board or thermal shaped insulation cardboard. Pressed tightly with pin, which ensure the winding is constantly pressed tightly.
4,leading wire
4.1 The layout of all leading wire is reasonable, which guarantees the enough electric distance and mechanical strenth.
4.2 All leading wire is cirlulized ,which guarantee the reliable wild or prize connection.
5,Oil tank
5.1 Oil tank adopts structure of flat top, bell jar type, which add the mechanical strength of oil tank and also make the appearance beautiful and graceful, site installation tend to be more convenient.
5.2 Pipeline with gas relay such as the oil tube and bushing hoist support on top of oil tank is with hoist gradient, to facilitate the gas in transformer flow to gas relay.
5.3 Vacuum oiling is adopted, there is no leakage and permanent distortion in the following test. vacuum-pumping :759mmHg load voltage test: bear 2 times the oil pressure of oil conservator oil surface for 24 hours.
5.4 The structure of transformer is convenient for disassembly and change of bushing and porcelain element.
5.5 The oil drip valve is set on the bottom of oil tank, sampling valve is set in the middle.
5.6 collective gas connecting tube is fixed on the bushing hoist support.
5.7 Transformer is of full-sealed structure, the upper and down oil tanks are required to welded fully.
6,Oil conservation tank
6.1 Adopt capsule type, finger type oil level indicator oil conservation tank.
6.2 The structure is convenient for internal cleaning, the capacity can ensure no oil overflow in 40 ambient temperature with full load, and oil shall be seen from oil level indicator before put into operation in -25.
6.3 Oil conservation tank is equipped with oil-sealed moisture absorber.
7,Safety protection device:
7.1 Gas relay is fixed in transformer, the standard complies with ZBK41004-89Gas relay.
7.2 There is enough and reliable pressure release device, and matched with oil spray pipe, the direction of oil spraying is downward.
8,Oil temperature measuring device:
8.1 There is pipe support of mercury thermometer, which is set on the top of oil tank.
8.2 There is temperature controller, the accuracy of thermometer complies with the related standard. Quantity and technical requirement shall as per tender document.
9,Each component of transformer shall be prefabricated once in manufacture factory, marked, to ensure the smooth procedure of site assembly. Before Ex-factory, inner core shall be check, and clean the fifth in transformer.
Technical parameters:
| Cooling method | |||||
| Winding | Connection | OLTC Position | Voltage | ||
| (kV) | Current A | ||||
| (ONAN) | Current A | ||||
| (ONAF) | |||||
| HV | Star | 1 | 207 | 529.9 | 892.5 |
| 9 | 230 | 176.9 | 803.3 | ||
| 17 | 253 | 433.6 | 730.2 | ||
| LV | auto | 9 | 132 | 831 | 1400 |
| Tertiary | Delta | 9 | 20 | 685.5 | 1155 |
| 7. Vector Group YN a0 d11 | |||||
| 8. Impedance Voltage in Percent at 75 | |||||
| Power MVA | winding | Rated voltage kV | Impedance voltage % | ||
| 320 | HV/LV | 230/132 | 18 | ||
| 9. No-load Current: 0.2%: | |||||
| 10. Sustained Short Circuit Current. | |||||
| Winding | Max. Sustained Short-circuit Current. Ka | ||||
| HV | 8.5 | ||||
| LV | 10.4 | ||||
| TV | 19 | ||||
| 11. Max. Duration of Short-circuits in Seconds(s) | |||||
| HV: 3s | |||||
| LV: 3 s | |||||
| TV: 3s | |||||
REFERENCE LIST
Our Performance:
| 1. | Pre sale service |
| a. | make technical solution |
| b. | send quotation, technical data sheet and drawing |
| c. | prepare power transmission plan, testing plan,and shipment plan |
| 2. | In sale service |
| a. | supervise the manufacturing schedule totally in accordance with the plan |
| b. | send photos to customer during every manufacturing process(hold point) |
| c. | inform the customer one week before testinng. |
| 3. | After sale service |
| a. | installation and commissioning, training the workers |
| b. | quick response within 12 hours any time |
| c. | provide 12 months gurantee period normally. |
FAQ For You
| 1. Q: | What is your delivery time ? |
| A: | Depend on the type of transformer. |
| 2. Q: | What is your payment term? |
| A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
| 3. Q: | What kind of starndard you follow? |
| A: | IEC, ANSI, CSA, GB, etc |
| 4. Q: | What kind of supporting documentation you can provide normally |
| A: | Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
| 5. Q: | What is your normal wanrranty period? |
| A: | 12 months after transformer operation. |
| 6. Q: | Can u do installation and commissioningin user's site? |
| A: | Yes, we can send our installation team to user's country for service. |
| 7. Q: | Do you have any experience in this kind of transformer? |
| A: | Yes, we can provide reference list for check. |
| 8. Q: | Are you manufacturer or trading company? |
| A: | Manufacturer and Trading company. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and please trust both of us will create a brilliant future!
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR253923". Items marked "" are certified.
Company Profile
Ningbo Ville Electric ( Enterprise) Co., Ltd. It is a well-know listed company in China specialized in R& D and manufacture of transformer Specialized in research, development, production of transformer and high voltage & Low voltage electrical power equipment.
Our Transmission and distribution companies can provide with whole solution for transformer substation and switch substation trunkey project!
The rated voltage is up to 550kV.
It locates in Hi-technical enterprise R & D center zone of Ningbo, Zhejiang province, which is one of the well-know coastal city in China. Its professional engaged in power substation, power plant project and electrical power complete equipments.
Working field: Manufacturing, engineering, designing, executing and commissioning for HV and LV electrical products. Transformer custom made up to 550KV.
Our transformer factory main working is visiting end user's site do measure and reseach before designe, and providing economic transformer solution for customer. Engineering, manufacturing, executing, commissioning and repairing for different kind of transformer (04kv -500kv ).
The products are mainly used in Steel plant; Power - Fossil fuel plant, Nuclear power plant, Railway, Subway and Airport. Wind power generation; Hydroelectric plant engineering; International power generation plant; Power substation transmission and distribution; Residential housing estate power distribution system and so on.
Transformer factory Product includes:
Three phase double (three)- winding power transformer, generator power transformer, auto power transformer, rectifier transformer for each industry, furnace transformer, movable transformer, traction transformer and reactor, power plant auxiliary and standby transformers, transformers for substations of backbone and distribution networks. Transformer for metallurgical companies etc.
In order to achieve the enterprise's strategic target---being stronger, larger, and superior, we continue to expand throughout the world's markets for power transmission and distribution area. And we also actively attach our team to competition, walking forward to the mission of "First-class worldwide transformer supplier"
Supply the guide drawings and installation manuals information directions on the method of handling, storage, mounting and erection of transformers.
Power equipment application:
Power-fossil fuel plant, Steel plant, Infrastructure- railway, international generation, substation, hydropower station, wind power substation, transmission and distribution.
We has excellent experience and good capacity in complete projects equipments in Generation, Substation, Transmission and Distribution from 400V-50kv, especially in Power plant, Substation construction and Transmission line, including of design, complete equipment, installation, Commissioningand after-sales service, and also design the complete Electrical Solutions according to customer's demand. We are mainly services to International State Power Board, Power Construction Contractor, Power Project Contractor, Factories and the Electric Power Project in the world.
In order to achieve the enterprise's strategic target---being stronger, larger, and superior, we continue to expand throughout the world's markets for power transmission and distribution area. And we also actively attach our team to competition, walking forward to the mission of "First-class worldwide electrical equipment supplier"
About Our Factory & Business Background
- Address
- FL6, No. C12 Building, Guanghua Road Ningbo R&D Park, Ningbo National Hi-tech zone, Ningbo, Zhejiang, China
- Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, FCA, EXW
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 3-6 months - Nearest Port
- ningbo, shanghai, dalian
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2006-07-05
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is your delivery time?
- Depend on the type of transformer.
- What is your payment term?
- 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
- What kind of starndard you follow?
- IEC, ANSI, CSA, GB, etc
- What kind of supporting documentation you can provide normally
- Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc
- What is your normal wanrranty period?
- 12 months after transformer operation.
- Can u do installation and commissioningin user's site?
- Yes, we can send our installation team to user's country for service.
- Do you have any experience in this kind of transformer?
- Yes, we can provide reference list for check.
- Are you manufacturer or trading company?
- Manufacturer and Trading company.
Send your message to this supplier
People who viewed this also viewed
-
US$200.00-40,000.00 / Piece
-
US$280,000.00-390,000.00 / Piece
-
Sg-10 10kVA Three-Phase Transformer 380V to 380V 220V 200V 110V Control Isolation Transformer 5000vaUS$175.00-330.00 / Piece
-
US$1,000.00-20,000.00 / Piece
-
US$150.00-1,500.00 / Piece
-
US$50,000.00-150,000.00 / Piece
-
US$100,000.00-180,000.00 / UNIT
-
US$15,000.00-35,000.00 / Piece
-
US$500,000.00 / Piece
-
US$1,000.00-10,000.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Power Transformer
- 400KV &500KV power transformer
- 500kv 400kv 330kv 230kv 110kv 69kv 35kv 20kv 10kv 6.6kv 0.4kv Power Transformers Customization Oil Distribution Transformer 1000000kVA
Related Categories
Hot Searches
- Voltage Transformer Factories
- China Transformer Factories
- Transformer Power Supply Factories
- Electronic Transformer Factories
- Used Power Transformer
- Custom Power Transformer
- Ac Power Transformer
- Single Power Transformer
- Electrical Power Transformer
- 400kv Transformer Bulkbuy