Customization: | Available |
---|---|
Application: | Power, Rectifier, Furnace Transformer, Power, Electronic, Instrument, Rectifier, Steel Industrial |
Phase: | Three, Three |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Norm and Size | Rated power kVA | number of phases | Valtage | loss(W) | No-load Loss(%) | No-load Loss(%) | ||
H.V(kV) | L.V(V) | No-Load Loss | Load Loss |
|||||
HSK-100 | 100 | 3 | 0.38 | 95 105 115 |
0.36 | 4 | 3.3 | 5 |
HSK-150 | 150 | 3 | 0.38 | 95 110 165 |
0.44 | 4.32 | 3.2 | 5 |
HSK-180 | 180 | 3 | 0.38 | 80 85 90 |
0.6 | 4.8 | 2.8 | 5 |
HSK-200 | 200 | 0.65 | 5.6 | 2.6 | 5 | |||
HSK-220 | 220 | 0.8 | 6 | 2.5 | 5 | |||
HSK-260 | 260 | 0.96 | 7.6 | 2.3 | 5 | |||
HSK-300 | 300 | 3 | 0.38 | 90 95 100 |
1 | 8 | 2.1 | 5 |
HSK-350 | 350 | 3 | 6.3(10) | 95 110 165 190 |
1.45 | 8.6 | 1.8 | 5 |
HSK-400 | 400 | 3 | 6.3(10) | 2 | 10 | 1.8 | 5 | |
HSK-500 | 500 | 3 | 6.3(10) | 100 115 175 200 |
2.3 | 14 | 1.5 | 6 |
HSK-630 | 630 | 3 | 6.3(10) | 98 116 170 200 |
2.45 | 15 | 1.3 | 8 |
HSK-800 | 800 | 3 | 6.3(10) | 3 | 17 | 1.1 | 9 | |
HSK-1000 | 1000 | 3 | 6.3(10) | 3.6 | 20 | 1.1 | 9 | |
HSK-1250 | 1250 | 3 | 6.3(10) | 104 121 180 210 |
3.8 | 23 | 0.85 | 10 |
HSK-1600 | 1600 | 3 | 6.3(10) | 5 | 28 | 0.85 | 10 | |
HSK-2000 | 2000 | 3 | 6.3(10) | 6.5 | 36 | 0.6 | 10 | |
HSK-2500 | 2500 | 3 | 6.3(10) | 110 127 190 220 |
8.3 | 52 | 0.6 | 9 |
1. |
Pre sale service |
a. |
make technical solution |
b. |
send quotation, technical data sheet and drawing |
c. |
prepare power transmission plan, testing plan,and shipment plan |
2. |
In sale service |
a. |
supervise the manufacturing schedule totally in accordance with the plan |
b. |
send photos to customer during every manufacturing process(hold point) |
c. |
inform the customer one week before testinng. |
3. |
After sale service |
a. |
installation and commissioning, training the workers |
b. |
quick response within 12 hours any time |
c. |
provide 12 months gurantee period normally. |
1. Q: |
What is your delivery time ? |
A: |
Depend on the type of transformer. |
2. Q: |
What is your payment term? |
A: |
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: |
What kind of starndard you follow? |
A: |
IEC, ANSI, CSA, GB, etc |
4. Q: |
What kind of supporting documentation you can provide normally |
A: |
Quotation,outline drawing,manufacturing plan, quality control plan |
5. Q: |
What is your normal wanrranty period? |
A: |
12 months after transformer operation. |
6. Q: |
Can u do installation and commissioningin user's site? |
A: |
Yes, we can send our installation team to user's country for service. |
7. Q: |
Do you have any experience in this kind of transformer? |
A: |
Yes, we can provide reference list for check. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!