on-Load Tap Changer for Transformer Load Break Switch Tap Changer
Contact Supplier
Product Highlights
- Improved Selector Structure: Traditional docking structure with good contacts and small torque, enhancing durability.
- Reinforced Under Flange: Strengthened prone-to-crack areas with engineering plastics to ensure high strength.
- Correct Arc Principle: Prevents rotating rod burning and gap expansion by optimizing arc contact design.
- Resistance Safety Baffle: Outer resistance baffle prevents scattering and short circuits during accidents.
- High Voltage Rating: Rated insulation level of 35 kV or 66 kV for reliable power transmission.
- Flexible Configuration: Options for 19 or 27 working positions, 10 or 14 contacts, and 0/1/3 middle positions.
- Comprehensive Warranty: 12 months guarantee period after transformer operation with quick 12-hour response.
- Global Service Support: Installation team available for on-site commissioning and training in user's country.
Product Attributes
- Customization
- Available
- Max Rated Current
- 200A 350A
- Connection Method
- Y, D
- Model NO.
- SV
- Rated Voltage
- 35kv or 66kv
- No of Contact
- The Thin Contacts Are 10 or 14
- No of Working Position
- It Could Reach 19 or 27 Positions.
- No of The Middle Position
- in The Middle Part There Are 0, 1, 3
- Voltage Regulating Method
- Positive and Negative Voltage
- Transport Package
- Wooden Cases
- Specification
- IEC CE, ISO
- Trademark
- VILLE
- Origin
- Ningbo
- HS Code
- 8535900090
- Production Capacity
- 50000 Sets
Shipping
- Shipping Cost:
- Contact the supplier about freight and estimated delivery time.
Online Trading Protection
- Payment Guarantee
-
Platform-protected payments with refund support for eligible order issues.
- Platform Logistics
- Clearer shipment tracking with platform-supported logistics.
- Inspection Service
- Optional pre-shipment inspection for quality and quantity checks.
- After-Sales & Dispute Handling
- Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Product Images of on-Load Tap Changer for Transformer Load Break Switch Tap Changer
Find Similar Products
Product Description
The structure of SV on-load tap-changer
Compared with other products, we made some improvements as follows:
1. Change the selector
At present, the domestic products still use the old foreign structure, i. E., the movable contact makes connection with the fixed contact. This structure has a large torque. Our company switched over to the traditional docking structure with good contacts and small torque. The insulation bracket is made from three isolated wall with a high-to-ground withstand voltage.
2. Under flange improvement
The under-flange s made of engineering plastics and lifted by four screws. While in the accidents, the increased pressure often damage the under-flange (it occurs at home and abroad ). Therefore, our company strengthens the prone-to-crack place to ensue good strength.
3. Correct arc principle
Some domestic manufacturers apply with slide between are contact and rotating pole. When the arc contact leaves from the fixed contact, the current will breaks, and the current passes through arc contact to the rotating rod. As the gap between the two can only connect by the arc, the rotating rod will burn off and the gap will get larger, resulting in the broken of the rotating poles, thus accidents arise. We considered of this and take appropriate
measures.
4. Correct resistance installation
Products of the same kind at home and abroad have no outer resistance baffle. Resistance will be scattered in accidents. Under the effectf elasticity,it collapses which cause the tapping short circuit and threaten the safety of the transformer. We add one baffle at the outer layer of resistances as a preventive measure, enhancing the reliability.
Type designation
Voltage-regulating method: W- Positive- Negative voltage- Regulating G- - Thickness regulating
No. Of the middle position: In the middle part there are 0, 1 and 3.
No. Of working position: It could reach 19 or 27 positions.
No. Of contact: The thin contacts are 10 or 14.
Voltage grade (kV): Rated insulation level: 35 kV or 66 kV.
Connection method: Y- Neutral connection, D- Other connection
Technical parameters:
Max. Rated current (A): 200A, 350A
No. Of phase: III - Three-phase I- Single-phase
E. G. SV III 350 Y - 66 - 10 193 W
SV series switch, three-phase, maximum rated current 350 A, neutral connect, voltage at 66 kV, 10 contacts for thin-regulating, 19 working positions, 3 middle-position, which conversion selector, positive-negative regulating.
| Type | SV350 | SV200 | |||||
| Max.rated current (A) | 350 | 200 | |||||
| No. Of phases |
1 | 3 | 3 | 1 | 3 | 3 | |
| Connect Method |
_ | Y | D | _ | Y | D | |
| Short-current test current (kA) | Heat stabilization (3 seconds.) Act stabilization (peak value ) |
5 12.5 |
4 10 |
||||
| Voltage between grades (V) | Spot 10 Spot 12 Spot 14 |
1500 1400 1000 |
1500 1400 1000 |
||||
REFERENCE TRANSFORMER:
Company Introduction
NingboVille Enterprise Co.,Ltd. is a combination of Transformer R&D center, production, sales and after sales service,possesses of strong technical strength and excellent manufacturing equipments, as well as modern Office facilities. It specially produces large scale power transformer and industrial transformers of high quality and reliability. A large share of its resources are devoted to research and development of industrial and special transformers and reactors for any special application,such as the
iron and steel and electrometallurgical industries.The company main working is suppling,engineering,designing,manufacturing, executing, and commissioning for transformer.
Why Choose Us
FIRST-CLASS PROCESSING AND TEST EQUIPMENT
We have more than 500 sets of sophisticated, advance production and test equipments, complete and perfect processing equipments, and scientific and rational processing technology, which guarantee first-class products, Authorized by the Bureau of Zhejiang Technology Supervision, Quzhou Fangyuan Inspection Company of Power Transmission and Transformation Equipment, whick is based on our testing center, undertakes the quality inspection of the industry in our province, this is a solid guarantee for our excellent product quality.
BEAUTIFUL ENVIRONMENT
We are confident that good products come from good personnel, and good environment makes qualified personnel. The company is committed to creating a garden-like working environment for employees. We have green belts, modern standardized workshops and well-planned parks where we sow our youth; we work hard, so we are harvesting the future.
With the first-class quality products, reasonable price and excellent after-sale services.product not only best-selling all over the country,but also in the international market have higher credit, such as Thailand, Vietnam, Myanmar, Indonesia,alaysia,Philippines, Ethiopia and Nigeria, Saxonstan,Uzbekistan, Korea, Turkey, Sudan, Iran etc. especially in the steel enterprises, VILLE production of transformers already have high reputation.
Our Performance:
| 1. | Pre sale service |
| a. | make technical solution |
| b. | send quotation, technical data sheet and drawing |
| c. | prepare power transmission plan, testing plan,and shipment plan |
| 2. | In sale service |
| a. | supervise the manufacturing schedule totally in accordance with the plan |
| b. | send photos to customer during every manufacturing process(hold point) |
| c. | inform the customer one week before testinng. |
| 3. | After sale service |
| a. | installation and commissioning, training the workers |
| b. | quick response within 12 hours any time |
| c. | provide 12 months gurantee period normally. |
FAQ For You
| 1. Q: | What is your delivery time ? |
| A: | Depend on the type of transformer. |
| 2. Q: | What is your payment term? |
| A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
| 3. Q: | What kind of starndard you follow? |
| A: | IEC, ANSI, CSA, GB, etc |
| 4. Q: | What kind of supporting documentation you can provide normally |
| A: | Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA,CESI),reference list,etc |
| 5. Q: | What is your normal wanrranty period? |
| A: | 12 months after transformer operation. |
| 6. Q: | Can u do installation and commissioningin user's site? |
| A: | Yes, we can send our installation team to user's country for service. |
| 7. Q: | Do you have any experience in this kind of transformer? |
| A: | Yes, we can provide reference list for check. |
| 8. Q: | Are you manufacturer or trading company? |
| A: | Manufacturer and Trading company. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and please trust both of us will create a brilliant future!
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR253923". Items marked "" are certified.
Company Profile
Ningbo Ville Electric ( Enterprise) Co., Ltd. It is a well-know listed company in China specialized in R& D and manufacture of transformer Specialized in research, development, production of transformer and high voltage & Low voltage electrical power equipment.
Our Transmission and distribution companies can provide with whole solution for transformer substation and switch substation trunkey project!
The rated voltage is up to 550kV.
It locates in Hi-technical enterprise R & D center zone of Ningbo, Zhejiang province, which is one of the well-know coastal city in China. Its professional engaged in power substation, power plant project and electrical power complete equipments.
Working field: Manufacturing, engineering, designing, executing and commissioning for HV and LV electrical products. Transformer custom made up to 550KV.
Our transformer factory main working is visiting end user's site do measure and reseach before designe, and providing economic transformer solution for customer. Engineering, manufacturing, executing, commissioning and repairing for different kind of transformer (04kv -500kv ).
The products are mainly used in Steel plant; Power - Fossil fuel plant, Nuclear power plant, Railway, Subway and Airport. Wind power generation; Hydroelectric plant engineering; International power generation plant; Power substation transmission and distribution; Residential housing estate power distribution system and so on.
Transformer factory Product includes:
Three phase double (three)- winding power transformer, generator power transformer, auto power transformer, rectifier transformer for each industry, furnace transformer, movable transformer, traction transformer and reactor, power plant auxiliary and standby transformers, transformers for substations of backbone and distribution networks. Transformer for metallurgical companies etc.
In order to achieve the enterprise's strategic target---being stronger, larger, and superior, we continue to expand throughout the world's markets for power transmission and distribution area. And we also actively attach our team to competition, walking forward to the mission of "First-class worldwide transformer supplier"
Supply the guide drawings and installation manuals information directions on the method of handling, storage, mounting and erection of transformers.
Power equipment application:
Power-fossil fuel plant, Steel plant, Infrastructure- railway, international generation, substation, hydropower station, wind power substation, transmission and distribution.
We has excellent experience and good capacity in complete projects equipments in Generation, Substation, Transmission and Distribution from 400V-50kv, especially in Power plant, Substation construction and Transmission line, including of design, complete equipment, installation, Commissioningand after-sales service, and also design the complete Electrical Solutions according to customer's demand. We are mainly services to International State Power Board, Power Construction Contractor, Power Project Contractor, Factories and the Electric Power Project in the world.
In order to achieve the enterprise's strategic target---being stronger, larger, and superior, we continue to expand throughout the world's markets for power transmission and distribution area. And we also actively attach our team to competition, walking forward to the mission of "First-class worldwide electrical equipment supplier"
About Our Factory & Business Background
- Address
- FL6, No. C12 Building, Guanghua Road Ningbo R&D Park, Ningbo National Hi-tech zone, Ningbo, Zhejiang, China
- Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, FCA, EXW
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 3-6 months - Nearest Port
- ningbo, shanghai, dalian
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2006-07-05
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is your delivery time?
- Depend on the type of transformer. Peak season lead time is 1-3 months, and off-season is 3-6 months.
- What is your payment term?
- 30% advance by T/T, 70% before delivery by T/T or L/C, or we can discuss other terms.
- What kind of standard you follow?
- IEC, ANSI, CSA, GB, etc.
- What kind of supporting documentation you can provide normally?
- Quotation, outline drawing, manufacturing plan, quality control plan, testing plan, financial report, type test report (KEMA, CESI), reference list, etc.
- What is your normal warranty period?
- 12 months after transformer operation.
- Can u do installation and commissioning in user's site?
- Yes, we can send our installation team to user's country for service.
- Do you have any experience in this kind of transformer?
- Yes, we can provide reference list for check.
- Are you manufacturer or trading company?
- Manufacturer and Trading company.
Send your message to this supplier
People who viewed this also viewed
-
US$100,000.00-180,000.00 / UNIT
-
US$100,000.00-180,000.00 / UNIT
-
US$100,000.00-180,000.00 / UNIT
-
US$2,000.00-50,000.00 / Piece
-
US$2,000.00-50,000.00 / Piece
-
US$2,000.00-50,000.00 / Piece
-
US$1,000.00-20,000.00 / Roll
-
US$1,000.00-20,000.00 / Roll
-
US$1,000.00-20,000.00 / Roll
Find Similar Products By Category
- Supplier Homepage
- Products
- Transformer Components
- Transformer Tap Changer
- on-Load Tap Changer for Transformer Load Break Switch Tap Changer
Hot Searches
- Power Transformer Factories
- Electric Load Factories
- Power Load Factories
- China Transformer Factories
- Tap Switch
- Tap Changer Transformer
- Circuit Tap
- Tap Transformer
- Tap Changer For Transformer
- Transformer Tap Changer Bulkbuy