Water Cooling Clamping Water Cooled Electrode Holder for Ladle Furnace/Electric Arc Furnace

Product Details
Customization: Available
Certification: ISO
Place Style: Vertical
Gold Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, IATF16949, ISO 14064, QC 080000, ANSI/ESD, ISO 29001, ISO 50001
Import & Export Mode
Have Own Export License
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
  • Water Cooling Clamping Water Cooled Electrode Holder for Ladle Furnace/Electric Arc Furnace
Find Similar Products

Basic Info.

Model NO.
VLEH01
Type
Auxiliary Equipment
Usage
Steel Molding
Fuel
Gas
Customized
Non-Customized
Condition
New
Power Source
Electric
Automatic Grade
Semi-Automatic
After-Sales Service
on-Line
Warranty
1 Year
Appliable Standard
IEC/GB
Technical Specification
Please Advise
Dimension
According to Drawing
Application
Furnace
Transport Package
Wooden Case
Specification
According to specification
Trademark
VILLE
Origin
China
HS Code
85
Production Capacity
5000

Product Description

Water cooling electrode holder for furnace 

·Application:
 AC or DC electric arc furnace·
Ladle furnace·
Reduction furnace·
Induction furnace
Markets :· Steel making, Electro metallurgy, Graphitisation, Foundries, Glass works, Special machines.
The arc. water cooled cables have been designed for specific applications. The whole range benefits from the 
experience acquired in the arc furnace market, which is the most demanding one for cables. Nevertheless, 
supplies specific cables for each main application as electrometallurgy, foundries, ...· New application are 
possible, water cooled cables being the ideal solution for high current in limited space with need for flexibility.· 
The copper we use is exclusively high conductivity electrolytic copper (Cu min 99.9%).
The internal conductor structure is of "Rope-Lay" type, with elementary strands of concentric composition, 
using unit wires with an optimized diameter (from 0.5 to 0.85 mm).
The water jacket is an essential component, which often determines the cable's life time. This is a very technical
 product, with our own accurate specification. We strongly recommend not to use any other jacket on our cables
 even for temporary repair.
Bundle with stainless steel bands
Some of copper ropes are covered with perforated and highly abrasive resistant rubber tubes to prevent the 
copper wire broken or damaged.

Outline drawing:
Water Cooling Clamping Water Cooled Electrode Holder for Ladle Furnace/Electric Arc Furnace

Water Cooling Clamping Water Cooled Electrode Holder for Ladle Furnace/Electric Arc Furnace
Water Cooling Clamping Water Cooled Electrode Holder for Ladle Furnace/Electric Arc Furnace
Water Cooling Clamping Water Cooled Electrode Holder for Ladle Furnace/Electric Arc FurnaceWater Cooling Clamping Water Cooled Electrode Holder for Ladle Furnace/Electric Arc Furnace
Water Cooling Clamping Water Cooled Electrode Holder for Ladle Furnace/Electric Arc Furnace
Our Services

1.

Pre sale service

a.

make technical solution

b.

send quotation, technical data sheet and drawing

c.

prepare power transmission plan, testing plan,and shipment plan

2.

In sale service

a.

supervise the manufacturing schedule totally in accordance with the plan

b.

send photos to customer during every manufacturing process(hold point)

c.

inform the customer one week before testinng.

3.

After sale service

a.

installation and commissioning, training the workers

b.

quick response within 12 hours any time

c.

provide 12 months gurantee period normally.


FAQ

1. Q:

What is your delivery time ?

A: 

Depend on the type of transformer.

2. Q:

What is your payment term?

A: 

30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.

3. Q:

What kind of starndard you follow?

A: 

IEC, ANSI, C*SA, GB, etc

4. Q:

What kind of supporting documentation you can provide normally

A: 

Quotation,outline drawing,manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list,etc

5. Q:

What is your normal wanrranty period?

A: 

12 months after transformer operation.

6. Q:

Can u do installation and commissioningin user's site?

A: 

Yes, we can send our installation team to user's country for service.

7. Q:

Do you have any experience in this kind of transformer?

A: 

Yes, we can provide reference list for check.

8. Q:

Are you manufacturer or trading company?

A: 

Manufacturer with own import & export company.

Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier