| Customization: | Available |
|---|---|
| Application: | Power, Electronic, Instrument, Lighting, Rectifier, Audio, Furnace Transformer |
| Phase: | Three |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Ladle transformer is used as ladle power transformer. Using high power electric furnace, the furnace and continuous casting and rolling refining outside"quaternary" process equipment,it is the development direction of Chinas steel enterprises.The process of molten steel is beginning to refine and respectively in two different equipment. To melt and initial adjustment only plays the role of furnace, composition of high power function adequately, increase production capacity of electric arc furnace, improve steel production. However after second time refine the quality of steel was improved highly and easy to adjust ,which greatly improve steel components, expand the varieties of steel ladle, so is being widely used. In the early 1970s introduced from China, ladle, production of similar products also arise, in the 1990s ladle and ladle transformer have developed rapidly, and in 1997 by the industry standard JB/implementation of T8594-1997 "ladle. participate in the transformation of steel industry, actively develop the ladle transformer production and research work.
Capacity: 1000kva ~40000kva
Voltage:10kv 35kv 110kv 


| 1. | Pre sale service |
| a. | make technical solution |
| b. | send quotation, technical data sheet and drawing |
| c. | prepare power transmission plan, testing plan,and shipment plan |
| 2. | In sale service |
| a. | supervise the manufacturing schedule totally in accordance with the plan |
| b. | send photos to customer during every manufacturing process(hold point) |
| c. | inform the customer one week before testinng. |
| 3. | After sale service |
| a. | installation and commissioning, training the workers |
| b. | quick response within 12 hours any time |
| c. | provide 12 months gurantee period normally. |
| 1. Q: | What is your delivery time ? |
| A: | Depend on the type of transformer. |
| 2. Q: | What is your payment term? |
| A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
| 3. Q: | What kind of starndard you follow? |
| A: | IEC, ANSI, CSA, GB, etc |
| 4. Q: | What kind of supporting documentation you can provide normally |
| A: | Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA,CESI),reference list,etc |
| 5. Q: | What is your normal wanrranty period? |
| A: | 12 months after transformer operation. |
| 6. Q: | Can u do installation and commissioningin user's site? |
| A: | Yes, we can send our installation team to user's country for service. |
| 7. Q: | Do you have any experience in this kind of transformer? |
| A: | Yes, we can provide reference list for check. |
| 8. Q: | Are you manufacturer or trading company? |
| A: | Manufacturer and Trading company. |