Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch

  • Audited Supplier
  • 20 yrs

Contact Supplier

Product Highlights

  • Off-Circuit Operation: Operate only when transformer is cut off from the electrical network.
  • Manual Operation Mode: Features manual operation with vertical rotary movement and double-throw switching.
  • Oil Leakage Repair: Fix axle leakage by screwing plug; fix tank cover leakage by screwing solid nut.
  • 12 Months Warranty: Standard guarantee period of 12 months after transformer operation.
  • 12-Hour Response: Quick response service available within 12 hours at any time.
  • Installation Support: Engineers sent to user's site for installation, commissioning, and training.
  • 30-Year Experience: Over 30 years of experience in the power industry providing optimized solutions.
  • Multiple Certifications: Compliant with IEC, ANSI, CSA, GB, and ISO9001 standards.

Product Images of Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch

Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch pictures & photos
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch pictures & photos
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch pictures & photos
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch pictures & photos
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch pictures & photos
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch pictures & photos
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
  • Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
  • Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
    Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
  • Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
    Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
  • Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
    Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
  • Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
    Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
  • Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
    Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
  • Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
    Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch

Find Similar Products

Product Description

WSTII63/10-6× 5 Off-circuit Tap-changer with Strip Type
 
Product Description
This instruction is the brief introduction of the strip off-circuit tap-changer. The flange and lifting board of it are fixed on the transformer cover, the function for the tap-changer is that we can operate the tap-changer on the transformer cover, by regulating the tap position to realize the voltage regulating of transformer as required. But only after the transformer is cut off from the electrical network, when the transformer is under off-circuit State, could we operate this type of tap-changer.

If the tap-changer has oil leakage phenomenon, you must check the leakage position first, if the leakage is from the turning axle, please screw up the plug on the axle, if the leakage is from the tank cover, you should screw up the solid nut on the flange.
 
Product Parameters
 
 WSTII63/10-4×3  170  96  75  376  143  122  54  88  24  M6  φ43
 WSTII125/10-4×3  175  100  75  441  158  147  58  95  29 M8   φ43
 WSTII250/10-4×3  175  100  75  486  173  162  68  120  34  M10  φ43
 WSTII63/10-6×5  170  96  75  520  191  170  54  88  24  M6  φ43

Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Company Profile
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Tap Changer /Transformer off Circuit Tap Changer /Transformer Load SwitchOur Performance:
1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan,and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testinng.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time
c. provide 12 months gurantee period normally.

FAQ For You
1. Q: What is your delivery time ?
A:  Depend on the type of transformer.
2. Q: What is your payment term?
A:  30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q: What kind of starndard you follow?
A:  IEC, ANSI, CSA, GB, etc
4. Q: What kind of supporting documentation you can provide normally
A:  Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc
5. Q: What is your normal wanrranty period?
A:  12 months after transformer operation.
6. Q: Can u do installation and commissioningin user's site?
A:  Yes, we can send our installation team to user's country for service.
7. Q: Do you have any experience in this kind of transformer?
A:  Yes, we can provide reference list for check.
8. Q: Are you manufacturer or trading company?
A:  Manufacturer and Trading company.

Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.

 Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.

 Global Service
--Wherever you are, VILLE global network will support and provide you with value.

 Quick Response
--In response to your needs without delay, VILLE  knows the value of your time.

Thanks for choosing VILLE as your reliable partner and please trust both of us will create a brilliant future!

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR253923". Items marked "verified" are certified.

Watch Video
Watch Video
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.

About Our Factory & Business Background

Address
FL6, No. C12 Building, Guanghua Road Ningbo R&D Park, Ningbo National Hi-tech zone, Ningbo, Zhejiang, China
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms)
FOB, CFR, CIF, FCA, EXW
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 3-6 months
Nearest Port
ningbo, shanghai, dalian

Our Production Capability & Technical Expertise

Main Products
Electric Arc Furnace Transformer, Transformer, Power Transformer, Rectifier Cabinet, Distribution Transformer, Rectifier Transformer, Current Transformer, Transformer Combined Substation, Mobile Substation, Voltage Transformer

Our Industry Experience & Global Business Record

Export Year
2006-07-05
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is your delivery time?
Depend on the type of transformer.
What is your payment term?
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
What kind of starndard you follow?
IEC, ANSI, CSA, GB, etc
What kind of supporting documentation you can provide normally
Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc
What is your normal wanrranty period?
12 months after transformer operation.
Can u do installation and commissioningin user's site?
Yes, we can send our installation team to user's country for service.
Do you have any experience in this kind of transformer?
Yes, we can provide reference list for check.
Are you manufacturer or trading company?
Manufacturer and Trading company.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now