WSTII63/10-6× 5 Off-circuit Tap-changer with Strip Type
Introduction
This instruction is the brief introduction of the strip off-circuit tap-changer. The flange and lifting board of it are
fixed on the transformer cover, the function for the tap-changer is that we can operate the tap-changer on the
transformer cover, by regulating the tap position to realize the voltage regulating of transformer as required. But
only after the transformer is cut off from the electrical network, when the transformer is under off-circuit
State, could we operate this type of tap-changer.
If the tap-changer has oil leakage phenomenon, you must check the leakage position first, if the leakage is from
the turning axle, please screw up the plug on the axle, if the leakage is from the tank cover, you should screw
up the solid nut on the flange.
WSTII63/10-4×3 |
170 |
96 |
75 |
376 |
143 |
122 |
54 |
88 |
24 |
M6 |
φ43 |
WSTII125/10-4×3 |
175 |
100 |
75 |
441 |
158 |
147 |
58 |
95 |
29 |
M8 |
φ43 |
WSTII250/10-4×3 |
175 |
100 |
75 |
486 |
173 |
162 |
68 |
120 |
34 |
M10 |
φ43 |
WSTII63/10-6×5 |
170 |
96 |
75 |
520 |
191 |
170 |
54 |
88 |
24 |
M6 |
φ43 |
Our Services
1. |
Pre sale service |
a. |
make technical solution |
b. |
send quotation, technical data sheet and drawing |
c. |
prepare power transmission plan, testing plan and shipment plan |
2. |
In sale service |
a. |
supervise the manufacturing schedule totally in accordance with the plan |
b. |
send photos to customer during every manufacturing process(hold point) |
c. |
inform the customer one week before testing. |
3. |
After sale service |
a. |
installation and commissioning, training the workers |
b. |
quick response within 12 hours any time |
c. |
provide 12 months guarantee period normally. |
FAQ
1. Q: |
What is your delivery time ? |
A: |
Depend on the type of transformer. |
2. Q: |
What is your payment term? |
A: |
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: |
What kind of standard you follow? |
A: |
IEC, ANSI, CSA, GB, etc |
4. Q: |
What kind of supporting documentation you can provide normally |
A: |
Quotation, outline drawing, manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: |
What is your normal warranty period? |
A: |
12 months after transformer operation. |
6. Q: |
Can u do installation and commission in user's site? |
A: |
Yes, we can send our installation team to user's country for service. |
7. Q: |
Do you have any experience in this kind of transformer? |
A: |
Yes, we can provide reference list for check. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!