Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Contact Supplier
Product Highlights
- Off-Circuit Operation: Operate only when transformer is cut off from the electrical network.
- Manual Operation Mode: Features manual operation with vertical rotary movement and double-throw switching.
- Oil Leakage Repair: Fix axle leakage by screwing plug; fix tank cover leakage by screwing solid nut.
- 12 Months Warranty: Standard guarantee period of 12 months after transformer operation.
- 12-Hour Response: Quick response service available within 12 hours at any time.
- Installation Support: Engineers sent to user's site for installation, commissioning, and training.
- 30-Year Experience: Over 30 years of experience in the power industry providing optimized solutions.
- Multiple Certifications: Compliant with IEC, ANSI, CSA, GB, and ISO9001 standards.
Product Attributes
- Customization
- Available
- Phase
- Three
- Core
- Core-type Transformer
- Model NO.
- WSTII63/10-6x5
- Cooling Method
- Oil-immersed Type Transformer
- Certification
- ISO9001
- Frequency Characteristics
- Power Frequency
- Brand
- Ville
- Structure
- Three-Column Disconnector
- Operation
- Manual
- Grounding Mode
- Not Grounding
- Movement Mode
- Vertical Rotary Type
- Number of Poles
- Three Pole
- Grounding
- Un Grounded
- Series
- Three
- Run
- Vertical Rotation
- Switching Mode
- Double-Throw Type
- Common Model
- Vr
- Structure of Operating
- Manual
- off Circuit
- Tap Changer with Strip Type
- Voltage
- 10kv
- Current
- 63A 125A 250A
- Transformer Type
- Oil-Immersed
- Transport Package
- Wooden Case or as Per Requirement
- Specification
- IEC CE, ISO
- Trademark
- CNVILLE
- Origin
- Ningbo China
- HS Code
- 8504231300
- Production Capacity
- 50000 Sets/Year
Product Images of Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Find Similar Products
Product Description
This instruction is the brief introduction of the strip off-circuit tap-changer. The flange and lifting board of it are fixed on the transformer cover, the function for the tap-changer is that we can operate the tap-changer on the transformer cover, by regulating the tap position to realize the voltage regulating of transformer as required. But only after the transformer is cut off from the electrical network, when the transformer is under off-circuit State, could we operate this type of tap-changer.
If the tap-changer has oil leakage phenomenon, you must check the leakage position first, if the leakage is from the turning axle, please screw up the plug on the axle, if the leakage is from the tank cover, you should screw up the solid nut on the flange.
| WSTII63/10-4×3 | 170 | 96 | 75 | 376 | 143 | 122 | 54 | 88 | 24 | M6 | φ43 |
| WSTII125/10-4×3 | 175 | 100 | 75 | 441 | 158 | 147 | 58 | 95 | 29 | M8 | φ43 |
| WSTII250/10-4×3 | 175 | 100 | 75 | 486 | 173 | 162 | 68 | 120 | 34 | M10 | φ43 |
| WSTII63/10-6×5 | 170 | 96 | 75 | 520 | 191 | 170 | 54 | 88 | 24 | M6 | φ43 |
Our Performance:
| 1. | Pre sale service |
| a. | make technical solution |
| b. | send quotation, technical data sheet and drawing |
| c. | prepare power transmission plan, testing plan,and shipment plan |
| 2. | In sale service |
| a. | supervise the manufacturing schedule totally in accordance with the plan |
| b. | send photos to customer during every manufacturing process(hold point) |
| c. | inform the customer one week before testinng. |
| 3. | After sale service |
| a. | installation and commissioning, training the workers |
| b. | quick response within 12 hours any time |
| c. | provide 12 months gurantee period normally. |
FAQ For You
| 1. Q: | What is your delivery time ? |
| A: | Depend on the type of transformer. |
| 2. Q: | What is your payment term? |
| A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
| 3. Q: | What kind of starndard you follow? |
| A: | IEC, ANSI, CSA, GB, etc |
| 4. Q: | What kind of supporting documentation you can provide normally |
| A: | Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
| 5. Q: | What is your normal wanrranty period? |
| A: | 12 months after transformer operation. |
| 6. Q: | Can u do installation and commissioningin user's site? |
| A: | Yes, we can send our installation team to user's country for service. |
| 7. Q: | Do you have any experience in this kind of transformer? |
| A: | Yes, we can provide reference list for check. |
| 8. Q: | Are you manufacturer or trading company? |
| A: | Manufacturer and Trading company. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and please trust both of us will create a brilliant future!
About the Supplier
This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR253923". Items marked "" are certified.
Company Profile
Ningbo Ville Electric ( Enterprise) Co., Ltd. It is a well-know listed company in China specialized in R& D and manufacture of transformer Specialized in research, development, production of transformer and high voltage & Low voltage electrical power equipment.
Our Transmission and distribution companies can provide with whole solution for transformer substation and switch substation trunkey project!
The rated voltage is up to 550kV.
It locates in Hi-technical enterprise R & D center zone of Ningbo, Zhejiang province, which is one of the well-know coastal city in China. Its professional engaged in power substation, power plant project and electrical power complete equipments.
Working field: Manufacturing, engineering, designing, executing and commissioning for HV and LV electrical products. Transformer custom made up to 550KV.
Our transformer factory main working is visiting end user's site do measure and reseach before designe, and providing economic transformer solution for customer. Engineering, manufacturing, executing, commissioning and repairing for different kind of transformer (04kv -500kv ).
The products are mainly used in Steel plant; Power - Fossil fuel plant, Nuclear power plant, Railway, Subway and Airport. Wind power generation; Hydroelectric plant engineering; International power generation plant; Power substation transmission and distribution; Residential housing estate power distribution system and so on.
Transformer factory Product includes:
Three phase double (three)- winding power transformer, generator power transformer, auto power transformer, rectifier transformer for each industry, furnace transformer, movable transformer, traction transformer and reactor, power plant auxiliary and standby transformers, transformers for substations of backbone and distribution networks. Transformer for metallurgical companies etc.
In order to achieve the enterprise's strategic target---being stronger, larger, and superior, we continue to expand throughout the world's markets for power transmission and distribution area. And we also actively attach our team to competition, walking forward to the mission of "First-class worldwide transformer supplier"
Supply the guide drawings and installation manuals information directions on the method of handling, storage, mounting and erection of transformers.
Power equipment application:
Power-fossil fuel plant, Steel plant, Infrastructure- railway, international generation, substation, hydropower station, wind power substation, transmission and distribution.
We has excellent experience and good capacity in complete projects equipments in Generation, Substation, Transmission and Distribution from 400V-50kv, especially in Power plant, Substation construction and Transmission line, including of design, complete equipment, installation, Commissioningand after-sales service, and also design the complete Electrical Solutions according to customer's demand. We are mainly services to International State Power Board, Power Construction Contractor, Power Project Contractor, Factories and the Electric Power Project in the world.
In order to achieve the enterprise's strategic target---being stronger, larger, and superior, we continue to expand throughout the world's markets for power transmission and distribution area. And we also actively attach our team to competition, walking forward to the mission of "First-class worldwide electrical equipment supplier"
About Our Factory & Business Background
- Address
- FL6, No. C12 Building, Guanghua Road Ningbo R&D Park, Ningbo National Hi-tech zone, Ningbo, Zhejiang, China
- Terms of Payment
- LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
- International Commercial Terms(Incoterms)
- FOB, CFR, CIF, FCA, EXW
- Average Lead Time
-
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 3-6 months - Nearest Port
- ningbo, shanghai, dalian
Our Production Capability & Technical Expertise
Our Industry Experience & Global Business Record
- Export Year
- 2006-07-05
- Main Markets
- North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
FAQ
- What is your delivery time?
- Depend on the type of transformer.
- What is your payment term?
- 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
- What kind of starndard you follow?
- IEC, ANSI, CSA, GB, etc
- What kind of supporting documentation you can provide normally
- Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc
- What is your normal wanrranty period?
- 12 months after transformer operation.
- Can u do installation and commissioningin user's site?
- Yes, we can send our installation team to user's country for service.
- Do you have any experience in this kind of transformer?
- Yes, we can provide reference list for check.
- Are you manufacturer or trading company?
- Manufacturer and Trading company.
Send your message to this supplier
People who viewed this also viewed
-
US$500.00-80,000.00 / Piece
-
US$200.00-40,000.00 / Piece
-
US$280,000.00-390,000.00 / Piece
-
Sg-10 10kVA Three-Phase Transformer 380V to 380V 220V 200V 110V Control Isolation Transformer 5000vaUS$175.00-330.00 / Piece
-
US$200.00-40,000.00 / Piece
-
US$1,000.00-20,000.00 / Piece
-
US$2,000.00-5,000.00 / Piece
-
US$200.00-2,000.00 / Piece
-
US$50,000.00-150,000.00 / Piece
-
US$2,900,000.00-3,000,000.00 / Piece
Find Similar Products By Category
- Supplier Homepage
- Products
- Transformer Components
- Transformer Tap Changer
- Tap Changer /Transformer off Circuit Tap Changer /Transformer Load Switch
Related Categories
Hot Searches
- Power Transformer Factories
- Voltage Transformer Factories
- China Transformer Factories
- Electrical Transformer Factories
- Tap Switch
- Tap Changer Transformer
- Circuit Tap
- Tap Transformer
- Tap Changer For Transformer
- Transformer Tap Changer Bulkbuy