Customization: | Available |
---|---|
Certification: | CE, ISO |
Place Style: | Vertical |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
SN | Item | Qty | Remark |
1 | Mechanical parts | ||
1.1 | Furnace body (upper shell, lower shell, accessory) | 1 set | Upper shell: tubular |
1.2 | Tilting platform mechanism | 1 set | |
1.3 | Water cooled roof | 1 set | Tubular |
1.4 | Roof lifting and rotating mechanism | 1 set | |
1.5 | Electrode traveling mechanism | 1 set | Electrode arm & master |
1.6 | EBT platform | 1 set | |
1.7 | Rotation frame locking device | 1 set | |
1.8 | Electrode nippling device | 1 set | 4 pcs. cells |
1.9 | Cooling water distributor | 1 set | With instrument |
2 | Electrical parts | 1 set | |
2.1 | Transformer 18MVA/33kV c/w hydro-oil cooler | 1 set | China top make |
2.2 | High voltage switchboard | 1 set | GBC-40.5kV panel |
2.3 | Short network | 1 set | c/w water cooled cables |
2.4 | Lower voltage control panels | 1 set | GGD type panel |
2.5 | PLC automation and HMI system | 1 set | Siemens PLC, S7-300 |
3 | Auxiliary items | ||
3.1 | Hydraulic power pack | 1 set | Proportional valve & pump make: Parker |
3.2 | Door lance manipulator & carbon injection device | 1 set |
1. |
Pre sale service |
a. |
make technical solution |
b. |
send quotation, technical data sheet and drawing |
c. |
prepare power transmission plan, testing plan and shipment plan |
2. |
In sale service |
a. |
supervise the manufacturing schedule totally in accordance with the plan |
b. |
send photos to customer during every manufacturing process(hold point) |
c. |
inform the customer one week before testing. |
3. |
After sale service |
a. |
installation and commissioning, training the workers |
b. |
quick response within 12 hours any time |
c. |
provide 12 months guarantee period normally. |