LVB(T)-330 Series Inverted structure with oil-immersed paper of current
transformers
Introduction:
LVB (T) series current transformer has an inverted structure with oil-immersed paper insulation (Please see the
left figure).
It is connected in series with electric energy measurement, measuring, relay protection and transient protection
functions.
Primary coil has a through-type conducting rod structure with good dynamic and thermal stability; its maximum
thermal current can be up to 63kA/3s (when primary coil is connected in series).
Primary coil passes through the center of secondary coil without flux leakage. Measurement precision can be up
to 0.1and 0.2S grades.
Secondary coil is fixed in an aluminum shielded-case by casting organic materials; secondary measurement and
protection circuits cannot be damaged by insulation breakdown.
Optimal capacitor screen bushing is made of a complete piece of imported broadsheet cable paper; it is coiled
by an automatic wrapping machine which is controlled by a computer with high performance. It has a
technological de-centrality and an excellent insulation property. Partial discharge test is carried out under power
frequency test voltage.
Use the automatic vacuum drying treatment system produced by L*EYBOLD in Germany, carry out pressure-
changing vacuum drying treatment and oiling after a product is assembled completely, and all insulation
materials are imported from foreign countries. All these ensure that the dielectric dissipation factor of complete
product tan is less than 0.3%.
External insulation uses a porcelain cover with high strength, optimal surface field intensity together with lower
field intensity of internal bushing make the porcelain cover avoid explosion.
Secondary outlet box is a complete structure by casting the aluminum alloy; its sealing structure meets the
requirement of IP55, which is dust proof, water proof and air permeable; secondary terminal for wiring uses
Phoenix special terminal; it is more convenient for operations such as plug-in, pull-out and wiring etc.
Connection between components uses argon-arc welding, fill in high pressure nitrogen to detect leakage after
assembly is complete, so oil penetration and oil leakage caused by oil-immersed products are resolved at root.
Use an aluminum alloy cast case, all components including the base, connection box, stainless steel expander,
and nameplate etc do not rust forever.
It is light and handy with a small volume and light weight.
Symbol Explanation
Note: 1 The Company reserves the right to change the parameters in the table.
2 When the parameters required by the customer are different from that in the table, they can be negotiated
according to the requirement of the customer.
3 There are several current ratios for one-time switch of the transformer.
4 We also can provide with products which meet the requirement of IEC and ANSI.
Outline and Dimensional Drawing
Our Best Service For You
1. |
Pre sale service |
a. |
make technical solution |
b. |
send quotation, technical data sheet and drawing |
c. |
prepare power transmission plan, testing plan and shipment plan |
2. |
In sale service |
a. |
supervise the manufacturing schedule totally in accordance with the plan |
b. |
send photos to customer during every manufacturing process(hold point) |
c. |
inform the customer one week before testing. |
3. |
After sale service |
a. |
installation and commissioning, training the workers |
b. |
quick response within 12 hours any time |
c. |
provide 12 months guarantee period normally. |
FAQ For You
1. Q: |
What is your delivery time ? |
A: |
Depend on the type of transformer. |
2. Q: |
What is your payment term? |
A: |
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: |
What kind of standard you follow? |
A: |
IEC, ANSI, CSA, GB, etc |
4. Q: |
What kind of supporting documentation you can provide normally |
A: |
Quotation, outline drawing, manufacturing plan, quality control plan
testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: |
What is your normal warranty period? |
A: |
12 months after transformer operation. |
6. Q: |
Can u do installation and commission in user's site? |
A: |
Yes, we can send our installation team to user's country for service. |
7. Q: |
Do you have any experience in this kind of transformer? |
A: |
Yes, we can provide reference list for check. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!