Customization: | Available |
---|---|
Application: | Power, Electronic, Instrument, Furnace |
Phase: | Three |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cooling method | |||||
Winding | Connection | OLTC Position | Voltage | ||
(kV) | Current A | ||||
(ONAN) | Current A | ||||
(ONAF) | |||||
HV | Star | 1 | 207 | 529.9 | 892.5 |
9 | 230 | 176.9 | 803.3 | ||
17 | 253 | 433.6 | 730.2 | ||
LV | auto | 9 | 132 | 831 | 1400 |
Tertiary | Delta | 9 | 20 | 685.5 | 1155 |
7. Vector Group YN a0 d11 | |||||
8. Impedance Voltage in Percent at 75 | |||||
Power MVA | winding | Rated voltage kV | Impedance voltage % | ||
320 | HV/LV | 230/132 | 18 | ||
9. No-load Current: 0.2%: | |||||
10. Sustained Short Circuit Current. | |||||
Winding | Max. Sustained Short-circuit Current. Ka | ||||
HV | 8.5 | ||||
LV | 10.4 | ||||
TV | 19 | ||||
11. Max. Duration of Short-circuits in Seconds(s) | |||||
HV: 3s | |||||
LV: 3 s | |||||
TV: 3s |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |