Customization: | Available |
---|---|
Certification: | CE, ISO |
Place Style: | Horizontal |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Item | Data | |
Combustion medium (Natural Gas) | Calorific value | 35590KJ/m3 |
Pressure | 8000~12000Pa | |
Heating period | Online heating | 30min |
Transferring heating | 1.5~2h | |
Drying heating | 24~36h | |
Heating temperature | ≥1050ºC | |
Natural Gas consumption | 30~60 Nm3 /h | |
Max. temperature rising speed | ≥35ºC/min | |
Average temperature rising speed | ≥30ºC/min | |
Length of flame | ≥2.5m | |
Max. temperature difference in ladle | ≤30ºC | |
Installed gross capacity | 5KW | |
Max. opening angle of ladle cover | 85° | |
Fan | Full pressure | 4800Pa |
Air output | 4500Nm3/h | |
Ignition mode | Manual |
CN | Description | Qty | Remarks |
1 | CNG high speed combustion nozzle | 1 Set | |
2 | Fan | 1 Set | |
3 | Manual air butterfly valve | 1 Pc. | |
4 | Manual adjusting valve | 1 Pc. | |
5 | Special gas pressure gauge | 1 Pc. | |
6 | Metal hose | 2 pcs. | |
7 | Ladle cover (heat insulating material included) | 1 pc. | |
8 | Bracket and support | 1 set | |
9 | Control system (electrical elements make: Schneidar) | 1 set | |
10 | Piping | 1 set | |
11 | Hoist | 1 set |
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan,and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testinng. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months gurantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of starndard you follow? |
A: | IEC, ANSI, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation,outline drawing,manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
5. Q: | What is your normal wanrranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commissioningin user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
8. Q: | Are you manufacturer or trading company? |
A: | Manufacturer and Trading company. |