Secured Trading Service

Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch

  • Audited Supplier
  • 20 yrs

Contact Supplier

Product Highlights

  • Vacuum Arc Extinguishing: Eliminates oil carbonization and removes need for online filter plant.
  • High Insulation Level: Guaranteed insulation due to elimination of carbon granules on surfaces.
  • Enhanced Overload Capacity: Special mechanical contacts handle long-term current while vacuum handles instant current.
  • Wide Voltage Range: Max voltage 252kV, suitable for neutral point up to 550kV.
  • High Current Rating: Max rated current up to 2400A for single-phase and 1000A for three-phase.
  • Remote Control Operation: Compatible with SHM-III motor drive unit for motor or remote switching.
  • Fast Maintenance Response: Quick response within 12 hours and maintenance completed within one day.
  • Comprehensive Warranty: Standard 12-month guarantee period after transformer operation.

Shipping

Shipping Cost:
Contact the supplier about freight and estimated delivery time.

Online Trading Protection

Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.

Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.

Product Images of Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch

Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch pictures & photos
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch pictures & photos
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch pictures & photos
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch pictures & photos
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch pictures & photos
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch pictures & photos
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
  • Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
  • Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
    Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
  • Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
    Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
  • Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
    Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
  • Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
    Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
  • Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
    Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
  • Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
    Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch

Find Similar Products

Product Description

SHZV Vacuum On-Load Tap Changer For Oil Immersed Transformers switch
 
 
Product Description

General

Until now, the oil-immersed on-load tap changer (hereinafter referred to as OLTC), being widely used in worldwide substation, inside which the oil is an insulation medium for OLTC themselves and for extinguishing arc occurred on the main switching contacts and transition contacts, as well as a medium for lubrication of mechanical parts and for cooling of contacts and all other currentcarrying parts. Therefore, this type OLTC is also called the OLTC of arc-extinguishing inside the oil. The carbonization of oil for this type of OLTC is inevitable during the operating of tap changer. 

With the switching times increasing, inside the OLTC oil chamber there will be more and more carbonizations.Therefore, except from neutral point connection,in application for other winding connections of transformer, or power transformer with voltage of 220kV or above, the auxiliary device like online oil filter plant has to be assembled with the oil-immersed OLTC in order to guarantee the insulation level of oil and to decrease the carbon granule. When this kind of OLTC is used in the rectification and furnace transformer, it operates very frequently under the full-load or even over-load, which quickens the wearing-out of arcing contacts, the carbonization of oil and also the wearing-out of mechanical parts. As a result, such works as continual changing of new oil and replacement of arcing contacts, frequent inspection and maintenance have to be done to make the OLTC reliable, even replacing the new OLTC within the service life of transformer, the cost for maintaining its normal operation is quite expensive.

The type of oil-immersed and vacuum arc-extinguishing OLTC-SHZV,with arc contacts replaced by vacuum interrupter,has very prominent advantages:

1. The current breaking in the vacuum interrupter, and the arc produced also extinguishing in the vacuum interrupter, which solved the problem of oil carbonization. Therefore there is no need to equip with online filter plant under any application condition.

2. Since the carbonization of oil in the oil compartment is eliminated,the carbon granule adhered to the surface of insulation material does not exist any longer,the insulation level is guaranteed.

3. The task of carrying current for long time is undertaken by special mechanical main contacts while the vacuum interrupter only taking the current instantly through, so the overload capacityof OLTChas been improved greatly.

4. All the vacuum interrupters are fixed firmly and mal-operation will not happen.

The highest voltage of the OLTC is 252kV, three-phase OLTC is application for neutral point winding connection of transformer with voltage up to 550kV, and single-phase OLTC can be used for any selectable winding connection, the max. rated through current of tap changer is 1000 Amp. in three-phase and 2400 Amp. in single-phase.

SHZV structure is the combined type and is composed of diverter switch and tap selector.SHZV is installed on the top cover of transformer by its head flange,and connected to SHM-III motor drive unit through the upper gear box on the cover of OLTC, bevel gear (auxiliary devices) and driving shaft (horizontal & vertical), realizing the switching operation of OLTC by motor or remote control.

This operation instruction includes all the necessary information for the installation and operation of SHZV OLTC. The structure is subject to change without notice.

Product Parameters

Designation of the tap changer model number
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
The operating condition of OLTC

a. The temperature of oil in which the tap changer operates is - 25ºC ~ 100ºC .

b. The ambient temperature under which the tap changer operates is - 25ºC ~ 40ºC .

Technical Data of Type SHZV
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch

Mechanical operating principle of the tap changer

Tap change operation begins with the motor of motor drive unit, the driving force is transmitted to the bear gear box through the vertical driving shaft, then transmitted to the retarding mechanism on the head flange via the horizontal driving shaft, and its output shaft drives the insulation shaft rotate. The rotation of insulation shaft then drives the main driving system to operate the spring accumulation mechanism (the energy released from the energy-storing mechanism drives the diverter switch operate), and the Geneva wheel mechanism of tap selector, the rotating of Geneva wheel mechanism makes the singular or dual moving contact of tap selector rotate one operating
position.

Maintenance period

1.Maintenance should be carried on every 300,000 operations of tap changing.

2.Diverter switch should be replaced after 800,000 operations.

3.Maintenance should be carried on tap selector after 800,000 operations.

4.The maintenance of the tap changer is normally performed by Huaming. And usually the maintenance can be finished within one day.
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch

Company Profile

Main product line: Tap changer and HV switchgear

Tap changer manufacturing with fullest vertical integration
Tap Changer Products Range On-Load Tap Changer:
* Conventional OLTC for transformer with voltage up to 765kV
*Vacuum OLTC for oil transformer with voltage up to 765kV
*Vacuum OLTC for dry transformer with voltage of 72.5kV
Off-Circuit Tap Changer
* Application for the transformer with voltage up to 765kV
Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
Our Performance:
1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan,and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testinng.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time
c. provide 12 months gurantee period normally.

FAQ For You
1. Q: What is your delivery time ?
A:  Depend on the type of transformer.
2. Q: What is your payment term?
A:  30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q: What kind of starndard you follow?
A:  IEC, ANSI, CSA, GB, etc
4. Q: What kind of supporting documentation you can provide normally
A:  Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc
5. Q: What is your normal wanrranty period?
A:  12 months after transformer operation.
6. Q: Can u do installation and commissioningin user's site?
A:  Yes, we can send our installation team to user's country for service.
7. Q: Do you have any experience in this kind of transformer?
A:  Yes, we can provide reference list for check.
8. Q: Are you manufacturer or trading company?
A:  Manufacturer and Trading company.

Our advantages:

 Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.

 Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.

 Global Service
--Wherever you are, VILLE global network will support and provide you with value.

 Quick Response
--In response to your needs without delay, VILLE  knows the value of your time.

Thanks for choosing VILLE as your reliable partner and please trust both of us will create a brilliant future!

About the Supplier

This supplier has been audited by TÜV Rheinland. Verify the report on the official TÜV Rheinland website with ID "MIC-ASR253923". Items marked "verified" are certified.

Watch Video
Watch Video
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.
Ningbo Ville Electric Co., Ltd.

About Our Factory & Business Background

Address
FL6, No. C12 Building, Guanghua Road Ningbo R&D Park, Ningbo National Hi-tech zone, Ningbo, Zhejiang, China
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
International Commercial Terms(Incoterms)
FOB, CFR, CIF, FCA, EXW
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 3-6 months
Nearest Port
ningbo, shanghai, dalian

Our Production Capability & Technical Expertise

Main Products
Electric Arc Furnace Transformer, Transformer, Power Transformer, Rectifier Cabinet, Distribution Transformer, Rectifier Transformer, Current Transformer, Transformer Combined Substation, Mobile Substation, Voltage Transformer

Our Industry Experience & Global Business Record

Export Year
2006-07-05
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

What is your delivery time?
Depend on the type of transformer.
What is your payment term?
30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
What kind of standard you follow?
IEC, ANSI, CSA, GB, etc
What kind of supporting documentation you can provide normally
Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc
What is your normal wanrranty period?
12 months after transformer operation.
Can u do installation and commissioningin user's site?
Yes, we can send our installation team to user's country for service.
Do you have any experience in this kind of transformer?
Yes, we can provide reference list for check.
Are you manufacturer or trading company?
Manufacturer and Trading company.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now