| Customization: | Available |
|---|---|
| Application: | Power, Electronic, Instrument, Lighting, Rectifier, Audio |
| Phase: | Three |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
|
item
|
value
|
|
Model Number
|
SCB11
|
|
Usage
|
Power
|
|
Phase
|
Three
|
|
Coil Structure
|
F
|
|
Specification
|
standard
|
|
Use range
|
Power transformation
|
|
rated power
|
50
|
|
Moisture-proof method
|
Potting
|
|
cooling method
|
Oil-immersed air-cooled
|
|
External structure
|
Vertical
|
|
Iron heart shape
|
F type
|
The coils can be installed on both sides of the core, so the number of turns of the transformer can be allocated to the two coils, so that the average turn length of each coil is shorter and the copper loss of the coil is reduced. In addition, if two coils that require symmetry are wound on two coils respectively, a completely symmetrical effect can be achieved. A set of silicon steel sheets composed of four C-type silicon steel sheets is called ED-type silicon steel sheets. The shape of the transformer made of ED-type silicon steel sheets is flat and wide. Under the same power conditions, the ED transformer is shorter than the CD transformer. Larger, in addition, because the coil is installed in the middle of the silicon steel sheet, there is an external magnetic circuit, so the magnetic leakage is small, and the overall interference is small. However, all the coils are wound on a wire package, which is thicker, so the average turn length is longer , The copper consumption is relatively large.


Our Performance:
| 1. | Pre sale service |
| a. | make technical solution |
| b. | send quotation, technical data sheet and drawing |
| c. | prepare power transmission plan, testing plan,and shipment plan |
| 2. | In sale service |
| a. | supervise the manufacturing schedule totally in accordance with the plan |
| b. | send photos to customer during every manufacturing process(hold point) |
| c. | inform the customer one week before testinng. |
| 3. | After sale service |
| a. | installation and commissioning, training the workers |
| b. | quick response within 12 hours any time |
| c. | provide 12 months gurantee period normally. |
| 1. Q: | What is your delivery time ? |
| A: | Depend on the type of transformer. |
| 2. Q: | What is your payment term? |
| A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
| 3. Q: | What kind of starndard you follow? |
| A: | IEC, ANSI, CS*A, GB, etc |
| 4. Q: | What kind of supporting documentation you can provide normally |
| A: | Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
| 5. Q: | What is your normal wanrranty period? |
| A: | 12 months after transformer operation. |
| 6. Q: | Can u do installation and commissioningin user's site? |
| A: | Yes, we can send our installation team to user's country for service. |
| 7. Q: | Do you have any experience in this kind of transformer? |
| A: | Yes, we can provide reference list for check. |
| 8. Q: | Are you manufacturer or trading company? |
| A: | Manufacturer and Trading company. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Thanks for choosing VILLE as your reliable partner and please trust both of us will create a brilliant future!