Customization: | Available |
---|---|
Phase: | Three |
Cooling Method: | Oil-immersed Type Transformer |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
480mm plate type radiator for transformer parts
Introduction:
We are specializing in the production of high pressure and ultrahigh pressure, Large and super large power
transformer, Reactor ect, plate radiator, DBF series power transformer use fans & Power transformer air-
cooled control cabinet, Dry type transformer used cross flow cooling fans use of the cooling system. The
national industry standard JB/T5347, JB/T9642, JB/T8971 2013 version of the main drafting unit. Passed
the ISO9001:2008 quality system certification of qualified units.
We have the international advanced MTM company transformer plate radiator forming production line,
MAG/MIG welding equipment, We developed a low carbon environmental protection of the surface of the plate
radiator sandblasting processing production line and Power transformer used the plate radiator cavity
clean processing production process technology and equipment. China institute of atomic energy type test
plate radiator performance indicators qualified.
We adhere to the "strives for the survival by the quality, credibility for the development" business philosophy is
the pursuit of excellence.
For more information, please contact us!
Our Best Service For You
1. | Pre sale service |
a. | make technical solution |
b. | send quotation, technical data sheet and drawing |
c. | prepare power transmission plan, testing plan and shipment plan |
2. | In sale service |
a. | supervise the manufacturing schedule totally in accordance with the plan |
b. | send photos to customer during every manufacturing process(hold point) |
c. | inform the customer one week before testing. |
3. | After sale service |
a. | installation and commissioning, training the workers |
b. | quick response within 12 hours any time |
c. | provide 12 months guarantee period normally. |
1. Q: | What is your delivery time ? |
A: | Depend on the type of transformer. |
2. Q: | What is your payment term? |
A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
3. Q: | What kind of standard you follow? |
A: | IEC, ANSI, GB, etc |
4. Q: | What kind of supporting documentation you can provide normally |
A: | Quotation, outline drawing, manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list, etc |
5. Q: | What is your normal warranty period? |
A: | 12 months after transformer operation. |
6. Q: | Can u do installation and commission in user's site? |
A: | Yes, we can send our installation team to user's country for service. |
7. Q: | Do you have any experience in this kind of transformer? |
A: | Yes, we can provide reference list for check. |
Our advantages:
Quality Assurance
--From the very beginning, VILLE ensures quality in every step to achieve the best quality.
Experience Sharing
--With more than 30 years' experience in power industry, VILLE brings you an optimized solution.
Global Service
--Wherever you are, VILLE global network will support and provide you with value.
Quick Response
--In response to your needs without delay, VILLE knows the value of your time.
Ville Electric Company will keep up with the century, the epoch,
Sincerely look forward to your cooperation and win-win!
Create brilliant!