| Customization: | Available |
|---|---|
| Application: | Power, Electronic, Instrument, Lighting, Rectifier, Audio, Furnace Transformer |
| Phase: | Three |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
3.2MVA 35KV arc furnace transformer
Capacity: 3.2MVA
Connection Symbol: D-Y,d0-11
Primary Voltage(kV): 35
Secondary Voltage(V): 240-138
Regulation Voltage Step: 4
Type of tapping: Off-circuit power driven
Short-circuit Impedance(%): 7
No-load Loss(kw): 5.3
On-load Loss(kw): 41.1
Weight(Ton): Active Part 6.16 Oil 4.88 Transportion 13 Total 14.3
Main function and characteristic:
Electric furnace transformers are transformers which supply power to the electric furnaces. It can drop high voltage to the working voltage the electric furnaces need.
There are many kinds of electric furnaces,so there are many kinds of electric furnace transformers cooperating with them.Now,our company manufactures following electricfurnace transformers:electric furnace transformers used in steelelectric furnaces(including on-laod,no-load and enclosed reactor) ; mineral hot furnace transformers used to
smelt kinds of iron alloys,hydrosilicons,carbides,etc(single phase,three phases on-load and no-load tap changer).They are low loss and energy-saving products.Cooling
methods are self-cooling, forced oil water cooling, etc.
It can be designed specially according with customers' requirements.
The model of the electric furnace transformer is expressed as follows:
The meaning of model:
H--Steelmaking arc furnace,HJ--ladle furnace,HZ--electro-slag furnace,HC--calcium carbide furnace,HK--mineral hot furnace,HG--line frequency induction furnace;
Number of phase:D--single phase,S--three phase;
Types of cooling device :ONAN,wind cooling F,water cooling S.
The methods of oil circulation:natural circulation,forced oilcirculation P.
Tap changer:off-circuit tap changer,OLTC Z.
Enclosed attached device:changing leakage flux,enclosed reactor K.
Rated capacity:KVA.
Voltage class:KV.Capacity: 3.2MVA
Voltage:35kv 


Company Introduction
Why Choose Us
FIRST-CLASS PROCESSING AND TEST EQUIPMENT
We have more than 500 sets of sophisticated, advance production and test equipments, complete and perfect processing equipments, and scientific and rational processing technology, which guarantee first-class products, Authorized by the Bureau of Zhejiang Technology Supervision, Quzhou Fangyuan Inspection Company of Power Transmission and Transformation Equipment, whick is based on our testing center, undertakes the quality inspection of the industry in our province, this is a solid guarantee for our excellent product quality.
BEAUTIFUL ENVIRONMENT
We are confident that good products come from good personnel, and good environment makes qualified personnel. The company is committed to creating a garden-like working environment for employees. We have green belts, modern standardized workshops and well-planned parks where we sow our youth; we work hard, so we are harvesting the future.
With the first-class quality products, reasonable price and excellent after-sale services.product not only best-selling all over the country,but also in the international market have higher credit, such as Thailand, Vietnam, Myanmar, Indonesia,alaysia,Philippines, Ethiopia and Nigeria, Saxonstan,Uzbekistan, Korea, Turkey, Sudan, Iran etc. especially in the steel enterprises, VILLE production of transformers already have high reputation.
| 1. | Pre sale service |
| a. | make technical solution |
| b. | send quotation, technical data sheet and drawing |
| c. | prepare power transmission plan, testing plan,and shipment plan |
| 2. | In sale service |
| a. | supervise the manufacturing schedule totally in accordance with the plan |
| b. | send photos to customer during every manufacturing process(hold point) |
| c. | inform the customer one week before testinng. |
| 3. | After sale service |
| a. | installation and commissioning, training the workers |
| b. | quick response within 12 hours any time |
| c. | provide 12 months gurantee period normally. |
| 1. Q: | What is your delivery time ? |
| A: | Depend on the type of transformer. |
| 2. Q: | What is your payment term? |
| A: | 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it. |
| 3. Q: | What kind of starndard you follow? |
| A: | IEC, ANSI, CSA, GB, etc |
| 4. Q: | What kind of supporting documentation you can provide normally |
| A: | Quotation,outline drawing,manufacturing plan, quality control plan,testing plan, financial report, type test report(KEMA, CESI),reference list,etc |
| 5. Q: | What is your normal wanrranty period? |
| A: | 12 months after transformer operation. |
| 6. Q: | Can u do installation and commissioningin user's site? |
| A: | Yes, we can send our installation team to user's country for service. |
| 7. Q: | Do you have any experience in this kind of transformer? |
| A: | Yes, we can provide reference list for check. |
| 8. Q: | Are you manufacturer or trading company? |
| A: | Manufacturer and Trading company. |